|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-03-22-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2012
>
2012-03-22-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
5/24/2012 12:00:32 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee 22 March 2012 <br />4.0 Bridge &Bowman Renovation Projects <br />4.26 Roof Top Unit screening <br />11/2/11 <br />It was reported that the roof top hvac equipment would be larger than originally anticipated and could be 18 inches to 2 feet taller. <br />There was some concern expressed over the aesthetics of the larger units and the overall view of the school to the public, <br />notwithstanding any sound abatement concerns. Various options for screening and placement of support structure for future <br />screening were discussed. Currently six units suspected of a need for screening based on sound abatement were modified to include <br />roof reinforcing for future screen panels. It was discussed to increase this count to 10 to include units where screens maybe desired <br />for aesthetics as well; however this motion was not acted upon, leaving just the original 6 locations <br />12/8/11 <br />This issue was again discussed and the PBC elected to request a unit price be added to the bid submission for adding the steel <br />support to other RTU locations if the town elected to do so during construction. <br />1/19/12 <br />Initial feedback from architect was that they did not want to include a unit price for additional RTU locations, but they later <br />agreed to do so. <br />4.29.1 Environmental Services <br />2/9/12 <br />DPF presented a proposal for IAQ Monitoring during renovation and construction at Bridge and Bowman. PBC <br />would like to review in more detail the proposal. DPF will purchase equipment to set a baseline. Further review of <br />proposal for Industrial Hygienist services will take place at next meeting. <br />2/22/12 <br />Motion to approve IAQ Monitoring services with EBI consulting for initial phases of Bridge & Bowman work not to <br />exceed $42,260.00, see 2/8/12 EBI proposal and DPF request dated 2/22/12. <br />Motion: Phil Coleman 2 Dick Perry Vote: 6 -0 <br />4.30 Construction Contract <br />2/22/12 <br />Motion to accept letter of recommendation from Design Partnership of Cambridge, dated 21 February 2012, and to <br />forward the recommendation to the Town Manager to award the Bridge & Bowman Construction Contract to TLT <br />Construction for the bid amount of $18,214,400.00 which includes Alternate #1. <br />Motion: Phil Coleman 2 Dick Perry Vote: 6 -0 <br />4.31 On -Site Representative <br />3/8/12 <br />Motion to award construction on site representation/ clerk of the works contract to Daedalus Projects Inc. in the <br />amount of $380,000 for Bridge & Bowman. <br />Motion: Eric Brown 2 Phil Coleman Vote: 7 -0 <br />Page 3of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.