Lexington Permanent Building Committee <br />7.0 Estabrook Elementary <br />7.8 Estimates <br />22 March 2012 <br />9/8/11 <br />PBC requested info on estimates in Schematic Design. RF Walsh stated that there was one completed by the architect and one <br />completed by Walsh. <br />RF Walsh advised that the MSBA limits reimbursement on site work to +/- 8% of building costs, so town may have reduced <br />reimbursement if site costs are in excess of the limit. <br />10/27/11 <br />It was reported that very early cost modeling was showing the Estabrook project cost in the ballpark of 36 to 37.5 million <br />12/15/11 <br />Cost Summary tables were presented by RF Walsh, dated 15 December 2011, for various design options, with a cost range of <br />$38,894,133 to 42,783,546 for the preferred option 3C. <br />General discussion on overall costs took place along with discussion on reimbursement percentages from the state. There was some <br />discussion from the PBC that Walsh and DiNisco should be cognizant of % of reimbursement and not position the project such that <br />expected reimbursements reduce. <br />It was discussed that the furniture and technology allowances by MSBA may not serve full needs of school and may require <br />increases. <br />1/5/12 <br />Two cost estimates will be developed for schematic design phase and will be reviewed with PBC on 1126112 meeting, but the two <br />estimates will not be reconciled by that night. <br />1/19/12 <br />Estimate will be Uni format level 3 with ability to pull out identified items for further evaluation. Identified items listed under 7.14 <br />below. (i.e. 2 story space at library, roof garden, exterior canopies, etc.) <br />PBC concerned with temp conditions, logistics and enabling work and would like to be sure that Walsh is coordinating these events <br />with the Architects and the Estimators to be sure that the Estimates accurately reflect the costs. <br />PBC requested a copy of the narrative to be given to the estimator describing these site /project needs. <br />1/26/12 <br />Questions or clarifications from estimate discussion. <br />• Fee for Commissioning Agent paid by MSBA <br />• RFW states enabling site work is in estimate <br />0 Question raised that may need more exploration — where is soil to be stockpiled on site? <br />• Moving expense line may need funds to pay for packing <br />• Funds may be needed for school if staff to work with new technology to prepare it for school use. <br />• Escalation was reduced from prior estimate, is that appropriate? <br />3/8/12 <br />Motion to approve the Project Scope and Budget Agreement Exhibit A Project Budget Lexington Public School District budget <br />and reimbursement for the Estabrook School Project as reflected in approved form 3011 dated 2/12/12 and Reimbursement <br />Rate Certification, with a total Project Budget cost of $40,792,248, with a 37.27% reimbursement rate reflecting a Estimated <br />Maximum Total Facilities Grant of $12,250,739 as seen on line 113. <br />Motion: Phil Coleman 2 Charles Favazzo Vote: 7 -0 <br />7.9 Schedule <br />Received schedule 9115111, designer agreement should be resolved by early next week. PBC would like to see a copy. <br />10/27/11 <br />March 2012 — MSBA Approval <br />January 2013 — Start of Construction <br />September 2014 - Occupy Building <br />1/5/12 <br />ECC meeting in February and PBC would like to hear what feedback was from ECC. <br />1/19/12 <br />Next meeting will require votes of approval as submission due to MSBA on 212112. <br />Additional meetings and milestones identified on separate schedule. <br />BOS meeting on 1123112 will require PBC attendance, Jon H., Chuck F. and Pat G probable attendees. <br />1/26/12 <br />RFW considers project on schedule. <br />Schematic Design Submission to MSBA on 2/2/12 <br />IG has approved 149A process <br />CM application process underway, Qualifications due 2/16.. RFP 2/23. <br />Permitting needs to be addressed in the schedule. <br />Page 4of9 <br />