Laserfiche WebLink
PBC Meeting Minutes <br />3 -8 -12 <br />Motion: Joe McWeeney 2" d : Dick Perry Vote: 6 -0 <br />Affirmative: 6 Jon Himmel, Carl Oldenburg, Chuck Favazzo, Joe McWeeney, Dick Perry, Eric Brown <br />Negative: 0 <br />Abstained: 0 <br />Not Present: 2 Peter Johnson, Philip Coleman <br />Motion: To accept and support DiNisco Design Partnership letter of 26 January 2012 recommending approval of schematic design <br />submittal package inclusive of space summary template and Schematic Design floor plans for the Estabrook School project with an <br />estimated construction cost not to exceed $31,200,000 and estimated project cost not to exceed $40.8 million, with school <br />occupancy in September 2014; subject to compliance with Lexington Zoning Code and applicable laws. <br />Motion: Dick Perry 2nd: Jon Himmel Vote: 6 -0 <br />Affirmative: 6 Jon Himmel, Carl Oldenburg, Chuck Favazzo, Joe McWeeney, Dick Perry, Eric Brown <br />Negative: 0 <br />Abstained: 0 <br />Not Present: 2 Peter Johnson, Philip Coleman <br />2/9/12 <br />Reading Room: Sandy explained this area houses level literature which is different from literature in Library. It will also be used <br />as a Professional Development training room for teachers. If needed this room could become a classroom in the future. <br />Gym: Gym is used for voting segregating public from children is a concern as to how that can be done. Sandy discussed the <br />thought of possibly using room or rooms on the lower level for voting, this has been done in the past. <br />3/8/12 <br />Building Design Discussion <br />Building pushed back 7 feet on site and steps at front of building removed. DDP will bring grading plan to future meeting. DDP <br />discussed some design expectations. Talk about fenestration. Eric would like to keep the building simple. <br />7.15 LEED <br />12/1/11 <br />Brief discussion on LEED design. DDP expressed that MSBA reimburses 2% for LEED Silver certification the first pass thru the LEED <br />scorecard should occur in the schematic design phase. <br />1/5/12 <br />Draft of LEED scorecard will be at next meeting <br />1/19/12 <br />Draft of LEED scorecard, tentatively showing 34 points presumed yes, 33, presumed maybe and 39 presumed no. Although this <br />will continue to be developed thru design it is presumed that LEED Silver is achievable. <br />LEED Scorecard will be reviewed with Facilities after 2/2/12. <br />7.16 Mosaic <br />12/1/11 <br />There has been discussion about saving the Estabrook logo mosaic, so the construction of the mosaic is being tested for <br />contaminants during December break. <br />3/8/12 <br />No asbestos was found in the wall. Options are to replicate on a mural or move existing to new school. <br />7.17 Traffic Clarification <br />12/8/11 <br />PBC discussed the need for clarification as to the extent of involvement of the ETF committee with traffic concerns on the Estabrook <br />site. Peter Johnson will communicate a reminder to the ETF that the PBC has responsibility for oversight of traffic concerns within <br />the Estabrook site and that while they will seek a recommendation from the ETF on the amount of queuing that may be required <br />based upon their work leading to the property line, it is the PBC who should coordinate the actual design and layout of this work on <br />site with the architect and traffic consultant. <br />Page 7 of 9 <br />