|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-09-15-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-09-15-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
1/6/2012 10:54:13 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />15 September 2011 Meeting <br />9/8/11 <br />LandscapeArchitectsmetonsitewithownertoreviewclosingorderofconditionsandarenowwaitingforsmallupdatestosite <br />asbuiltforcompletion. <br />4.0 Bridge & Bowman Renovation Projects <br />4.4LEEDCertification <br />12/14/10 <br />TheProjectArchitectsoutlinedthatLEEDcertificationwasnotconsideredtobeviablegiventhescopeandnatureoftheproposed <br />workatBridgeandBowmanandrecommendedagainstpursuingthecertification.TheSchoolt©z-z¦xthoughtthatthefunding <br />forLEEDpursuitscouldbebettersuitedtogotowardsitemsthatwilleffectprogrammingoreducationalissues. <br />4/14/11 <br />LEEDwasdiscussedanditwasagreedthatworkshouldfocusonenergyaspectsandincorporateintothespecsthoseitemsthatcan <br />beincorporatedinthespiritofLEED.FurtherthatthelastpartofthelastsentenceoftheLEEDLtrfromDPCdated23November <br />2010,shouldbeEÞ;7vu|vwesuggestdesigningallsystemswithinthecurrentscopetoastandardthatwouldberequiredfor <br />LEEDCertificationbutnotaddadditionalscopesolelyforthepurposesofachieving-;©·zEz-·zu|Andreportbackonwhat <br />measuresarebeingdone. <br />4.8DPCProjectUpdate <br />5/12/11 <br />DesignPartnershipprovidedageneraloverviewoftheprojectfor30%DesignDevelopmentcompletioninclusiveofexpandedscope. <br />Primarytopicsofdiscussionwerefloorplanapproval,phasingplanforconstructionandWindowpatternsandschedule. <br />AtnextmeetingDPCwillpinupdrawingsforreviewandbringMEPEngineer.PBCwouldalsoliketoreviewDivision1specs <br />9/8/11 <br />CompleteDiv.1Specs.Nextupdateonspecsis9/16/11 <br />4.10PhasingPlan <br /> <br /> <br /> <br /> <br />DPCpresentedapreliminaryphasingplanthatcarriesthemajorityofworkovertwosummerswithsecondshiftworkandweekend <br />orschoolholidayworkconsidered. <br />Questionsandconcernsraisedincluded: <br />Wastheestimatebasedonsuchaphasingplan,DPCconfirmedyes. <br />Generalconcernovertheabilityofthecontractortocompletetheworkinthetimegiven <br />AdministrativesectionneedstobeincludedinPhase1work. <br />Aresufficientexistingconditionssurveysbeingcompletedtoavoiddelaysandchangeordersduringconstruction? <br />Awrittennarrativeofthephasingplanwasrequested. <br /> <br /> <br /> <br />Concernwasagaindiscussedoverthecontentandqualityofthephasingplansandspecsandadditionalinformation,i.emore <br />detailedplan,shouldberequestedfromDPC.DPFwillfollowup. <br /> <br /> <br /> <br />Generaldiscussionoverthetightscheduleandconcernforcompletingphasesontime. <br />Dr.AshaskedhowconfidentDPCwasincompletingworkattheendofeachsummer.DPCrespondedthattheyfeltgoodaboutitas <br />longasthebidprocessgaveusagoodcontractor.FurtherDPCfeltthatprequalifyingbidderscouldworkinourfavorforthisissue. <br />ContractneedstobesignedbymidMarchtoApril1tostartspringwork.Timewillbeneededatthebeginningandendofeach <br />summertomoveClassroombelongingsinandoutofplannedrenovationareas.WorkisincludedinphasingplanforstartinginApril <br />fornewboilerroomconstruction.Night&weekendworkisscheduledthroughtheconstructiondurationwithdoubleshifts <br />anticipatedduringthesummermonths. <br />Athreesummerprojectwasbrieflydiscussedbutnotlookeduponfavorably. <br />AFurniturebudgetneedstobeaddedtoindirectcoststoaccountfornewclassroomfurnitureintheaddedclassroomsandthe <br />renovatedlibrarycheckoutdesks. <br /> <br /> <br /> <br /> <br />DiscussiononsecondshiftconstructioninCentralcoreareas,preferredoverregulardayshift.Itwassuggestedthatallafternoon <br />programmingatbothschoolsshouldberelocatedtootherbuildingsduringtheconstructionphases. <br />Keydateswithinthesummerconstructionsequencesshouldbeidentifiedandincludedinthespecssopthattherearemidsummer <br />milestonestohelpkeeptheprojectontrack. <br />PBCstillhasconcernforthephasingandtheschedule. <br />9/8/11 <br />Questionwasaskediftherewasanythoughtofputtingtheadministrativeareaintotrailers?AnsweristheAdministrativestaff <br />mustbeinthebuilding. <br />Page 5 of 12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.