|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-09-15-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-09-15-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
1/6/2012 10:54:13 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />15 September 2011 Meeting <br />2.0 PUBLIC WORKS & FACILITIES BUILDING PROJECT <br />2.60SiteSignageatStreet <br />Forthepurposesofreducingongoingprintedtext,previousentriesunderthisheadingmayhavebeenremovedfromcurrent <br />meetingminutes.Pleaserefertopreviouseditionsoftheminutesforolderinsertions. <br />11/9/10 <br />Existinglightshavebeenpoweredupandaretoostrongandcreatehotspots,DPFtocontactlightvendorforfixture <br />recommendations. <br />12/14/10 <br />DPFmadecontactwithReflexlightingandiswaitingfixturerecommendations. <br />1/13/10 <br />DPFworkingwithDPWtodevelopcosteffectivedesignsolutiontolightingissue. <br />4/14/11 <br />DPFreportedthattheyhadlookedatLEDfixtures,butconcernshadbeenexpressedoverLEDlightingnotworkingwellforoutdoor <br />groundlighting.DPFhaslookedatconventionalgroundspotlightsforsignageandisplanningtocoordinateaneffortwithDPW <br />thissummertoimprovethelightingandplantingaroundthesign. <br />9/8/11 <br />DPFtoworkwithlocalelectriciantoreplacelargegroundlightswithsmallerconventionalunitsandworkwithDPWtocreate <br />smallmulchbedandgroundcover. <br />2.82WashBay <br />Forthepurposesofreducingongoingprintedtext,previousentriesunderthisheadingmayhavebeenremovedfromcurrent <br />meetingminutes.Pleaserefertopreviouseditionsoftheminutesforolderinsertions. <br />10/12/10 <br />ItwasdiscussedthatinfuturecontractsSystemDesignStatementsalongwithtrainingrequirementsneedtoincludedesignintent. <br />9/8/11 <br />Stillindiscussions. <br />2.83FrontWalkway <br />Forthepurposesofreducingongoingprintedtext,previousentriesunderthisheadingmayhavebeenremovedfromcurrent <br />meetingminutes.Pleaserefertopreviouseditionsoftheminutesforolderinsertions. <br />12/14/10 <br />HKTprovidedseveralsketchesthatwouldsatisfytherequirementtoconnectionthepublicsidewalktothefrontentrance.ThePBC <br />electedtohaveBillHadleyselectawalkwayplanfromthosepresented,thathewassatisfiedwithandgetpricingtocompletethe <br />work. <br />4/14/11 <br />Reportednoactivitytodate,waitingforsnowtomelt,DPWwillbeobtainingpricesforworkdefinedbyHKTandwillreportbackto <br />PBC. <br />5/12/11 <br />DPWhasHKTplansandisinprocessofgettingpricing. <br />6/9/11 <br />Onepricereceivedtryingtoobtainasecond. <br />9/8/11 <br />MarkBarretttoworkwithDPWtoseeifsecondquoteisavailableandobtainatimelineforworktobedone. <br />2.84CloseOut <br />5/12/11 <br />PBCfrustratedthatprojecthasnotbeen{-;7Ò·|uDPFsharedthatfrustrationandwhilewehavebeenfollowingsome <br />warrantyitems,plantings,etc.closeouthasbeenawaitingthecompletionofthefluiddistributionsystemandthesiteasbuilt.DPF <br />ishopefulthattheseitemsarenearlycompleteandwewillbeableto{-;Ò·|project. <br />Page 4 of 12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.