|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-08-23-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2011
>
2011-08-23-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:23 PM
Creation date
1/6/2012 10:52:13 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />23 August 2011 Meeting <br />Aresufficientexistingconditionssurveysbeingcompletedtoavoiddelaysandchangeordersduringconstruction? <br />Awrittennarrativeofthephasingplanwasrequested. <br />6/9/11 <br />Concernwasagaindiscussedoverthecontentandqualityofthephasingplansandspecsandadditionalinformation,i.emore <br />detailedplan,shouldberequestedfromDPC.DPFwillfollowup. <br />4.11WindowPatternsandOperation <br />5/12/11 <br />DPCpresentedthreewindowdesignsA,BandC.ArchitectsliketypeC.Discussionfollowed.Bhasmostoperableunits,Atheleast, <br />Teachersandstaffwillwantmostoperableunits,whynotDoubleHung,DPChassafetyconcernondoublehung,questiononcosts <br />changesforoperableunits. <br />Architectstoreportbackatnextmeetingoncostsofoperableunits. <br />6/9/11 <br />Discussiononhungwindowsversusprojectingwindows.DPFtoforwardinfoonhungwindowsinFiskeandor <br />Harrington.PBCrequestscostoptionsondoublehungwindows. <br />4.12Projectschedule <br />5/12/11 <br />Projectschedulewasbrieflydiscussed;howeverfinaldecisionsonbidperiod,townelections,andTownMeetingmayrelyon <br />outcomeofTownBudgetSummitmeetingtobeheldinJune. <br />4.13Planreview <br />6/9/11 <br />DPChungcopiesofprintsfortheprojectaroundthegymwallsforthePBCtowalkthruandreviewtheplans. <br />4.14MeetingwithBuildingDepartment <br />6/9/11 <br />DPCreportshavingameetingwiththebuildingdepartmentandfiredepartment.Thescopeofworkoftheprojects <br />wasreviewedandthebuildingdepartmentandDPCidentifiedsomecompliancealternativesthatwouldbe <br />required. <br />Plumbingcodewaterclosetsinkitchenbathrooms <br />Firewallseparationatexistingmodularclassrooms <br />Maxoccupancybaseduponplumbingfixturerequestedbyplumbinginspector. <br />4.15EnergyCode <br />6/9/11 <br />DPCreportsprojectisexemptfromstretchenergycodeexceptfornewwork.PBCbelievesitshouldbebroughtto <br />theattentionoftheBOSthepathoftheprojectwithregardtothestretchenergycode. <br />4.16HotWater <br />6/9/11 <br />Plumbinginspectorhasconcernovergettinghotwaterinappropriatetime.DPCshouldtestHWatvariousspotsin <br />buildingtoseeifexistingdeliverysystemiscurrentlycompliant. <br />4.17Skylights <br />6/9/11 <br />Aparentgrouphasraisedthequestionofaddingskylightsinsomeinteriorclassrooms.PBCdiscussedhavingcosts <br />establishedforaddingskylights.PBCaskedDPCtopreparesomeoptionsfor6roomseachin2bldgs. <br />Page 6 of 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.