Laserfiche WebLink
PBC Meeting Minutes <br />09 June 2011 Meeting <br />4.12 Project schedule <br />5/12/11 <br />Project schedule was briefly discussed; however final decisions on bid period, town elections, and Town Meeting may rely on <br />outcome of Town Budget Summit meeting to be held in June. <br />4.13 Plan review <br />6/9/11 <br />DPC hung copies of prints for the project around the gym walls for the PBC to walk thru and review the plans. <br />4.14 Meeting with Building Department <br />6/9/11 <br />DPC reports having a meeting with the building department and fire department. The scope of work of the projects was <br />reviewed and the building department and DPC identified some compliance alternatives that would be required. <br />Plumbing code -water closets in kitchen bathrooms <br />Fire wall separation at existing modular classrooms <br />Max occupancy based upon plumbing fixture requested by plumbing inspector. <br />4.15 Energy Code <br />6/9/11 <br />DPC reports project is exempt from stretch energy code except for new work. PBC believes it should be brought to the attention <br />of the BOS the path of the project with regard to the stretch energy code. <br />4.16 Hot Water <br />6/9/11 <br />Plumbing inspector has concern over getting hot water in appropriate time. DPC should test HW at various spots in building to <br />see if existing delivery system is currently compliant. <br />4.17 Skylights <br />6/9/11 <br />A parent group has raised the question of adding skylights in some interior classrooms. PBC discussed having costs established <br />for adding skylights. PBC asked DPC to prepare some options for 6 rooms each in 2 bldgs. <br />4.18 BOS Presentation <br />6/9/11 <br />PBC discussed having a meeting in late July or early August and inviting BOS /Energy Committee /CPC /CEC /Town Manager. <br />It was discussed that the format of the presentation might be best based upon the phasing plan. <br />4.19 Bridge Gym Floor <br />Old mastic below existing gym floor at bridge would require added project scope to abate. Gym floor is presently in reasonable <br />shape (aged but not failing). Discussed cost options need for replacement. <br />4.20 Entrance <br />6/9/11 <br />Current scope has no plans for modifications at the building entrance discussion on removing existing entrance canopy and <br />adding new canopy with new walks and landscaping to improve school entrance. It was proposed that this element of the work <br />could go a long way in soliciting support for the project. <br />Page 7 of 8 <br />