Laserfiche WebLink
ViewPoint Cloud Permit# CDOA-20-34 <br /> Request for Determination of Applicability, 39 Turning Mill Road <br /> Applicant: Barbara Buchmann for Peter Von Thuna <br /> Property Owner: Peter Von Thuna <br /> Project: Abandonment of existing septic system, and the construction of a sewer extension <br /> between the existing home and the existing stub located within Turning Mill Road. Portions <br /> of the work proposed are within one hundred feet of jurisdictional wetlands, to the east of the <br /> work area. <br /> Documentation Submitted: <br /> — "Site Plan, 39 Turning Mill Road"; Sheet No 1 of l; Prepared for: Barbara Buchmann; <br /> Prepared, stamped and signed by: Frederick W. Russell, PE Civil No. 36713; Scale: <br /> 1"=20' and not to scale; Dated 12/16/2020 <br /> — "Description of Work"; Uploaded by Mary Trudeau Hill on 12/18/2020; <br /> — "WPA Form 1-Request for Determination of Applicability" application; Prepared for: <br /> Barbara Buchmann; Prepared by: Mary Trudeau Hill; Signed 12/18/2020; <br /> — "USGS Locus for 39 Turning Mill Road, Lexington, MA"; dated 12/17/2020; <br /> — "National Flood Hazard Layer FIRMette"; Provided by: FEMA; Scale: 1:6,000; Dated <br /> 12/17/2020; <br /> — "39 Turning Mill Road, Lexington, MA: NHESP and DEP Wetland Mapping"; dated <br /> 12/17/2020; <br /> — Memo from Mary Trudeau, Wetlands Consultant, to Peter Von Thuna, Property Owner; <br /> RE: "39 Turning Mill Road, Lexington, MA Wetlands Delineation"; Dated 11/30/2020; <br /> Ms. Mary Trudeau, Wetland Scientist representing the applicant, Mr. Peter Von Thuna, <br /> presented before the Commission. Mr. Von Thuna would like to sell his property and in order to <br /> do this will need to either fix his failed Title V septic system or connect to sewer. The current <br /> system is non-functioning; however, no one is residing in the home. Portions of the home fall <br /> within the 50 to 100 foot buffer zone and the home will act as an erosion control barrier for much <br /> of the work. The sewer line is a 6-inch gravity fed line and will range between 4 to 6 feet below <br /> the surface at about a 2% grade. The timeline for the project is estimated to be 1 to 3 weeks, <br /> depending on material availability and the time of year. <br /> Mr. Langseth asked if grass will be replaced when filling in the trench. Ms. Trudeau responded <br /> that the applicant will be replacing in-kind with rhododendrons and that most of the property is <br /> not currently grassy. <br /> Ms. Samuels asked how the patio will act as an erosion control and Ms. Trudeau responded that <br /> the patio is a step up so it will act as a barrier. <br /> On a motion by Ms. Ladd and seconded by Ms. Samuels, the Commission voted 7-0 by roll call <br /> vote to issue a negative determination with conditions. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br />