Laserfiche WebLink
with porous brick pavers, addition of condensers and a generator, reduction in size of the <br /> proposed terrace, and the addition of three cultec chambers to the northern infiltration system. <br /> Mr. Langseth asked what the original proposal for handling the sewage was. Project Engineer Al <br /> Gala responded that the original proposal did not show the plan as sewer and the architect <br /> proposed connecting the sewer to the manhole and typically that is not done. <br /> On a motion by Mr. Langseth and seconded by Ms. Ladd, the Commission voted 7-0 by roll call <br /> vote to approve this as an Insignificant Plan Change. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> Conservation Plan Modification/Insignificant Plan Change Request: 91 Hartwell Ave, ViewPoint <br /> Cloud# CPM-21-3, DEP 201-1163, CNOI-19-27 <br /> Mr. Paul Finger, Landscape Architect, presented before the Commission, requesting a change in <br /> the sequence of construction. This is a phased development and the applicant is going to be <br /> relocating all surface parking to the east of the site, which is the highest portion, while the <br /> parking structure is constructed on the west side. This will require that floodplain compensation <br /> will take place in phase two while the applicant finalizes the first floor. <br /> Mr. Finger added that an address reassignment has been requested to change the address to 5 <br /> Hartwell Place. <br /> On a motion by Mr. Langseth and seconded by Mr. Beuttell, the Commission voted 7-0 by roll <br /> call vote to approve this as an Insignificant Plan Change. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:11 PM New Public Meetings/Hearings <br />