|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-01-04-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2021
>
2021-01-04-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 9:02:42 AM
Creation date
1/22/2021 9:02:36 AM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— "Stormwater Analysis" and "Operation and Maintenance Plan";prepared and signed by <br /> Frederick W. Russell, PE; dated July 15, 2020 and revised through December 4, 2020 <br /> — Memo from Michael Sprague, Engineering to Karen Mullins, Conservation; Re: "11 <br /> Norton Rd AOOC Comments"; Dated 1/4/2021 <br /> Mr. Richard Kirby, Wetland Scientist with LEC Environmental, presented before the <br /> Commission. This request for an amendment to the Order of Conditions is due to the buyer of the <br /> house wanting more outside seating in the form of a wraparound porch on the front left corner of <br /> the house. Project Engineer Frederick Russell redesigned the rear infiltration system to <br /> accommodate the runoff from the additional impervious area, and did so by increasing the <br /> amount of stone surrounding the unit. <br /> Questions from the Commission: <br /> — Is the dimensional change related to the infiltration system, essentially making it two feet <br /> longer, reflected on the revised plan? <br /> Responses of the Applicant: <br /> — The bed was lengthened and the plan shows a 34 foot dimension that would have <br /> previously been 32 feet. <br /> Ms. Mullins brought to the attention of the Commission and Mr. Kirby that the distance from the <br /> side yard to the porch, 11.5 feet, may be from the original plan. The application for an Amended <br /> Order of Conditions does not go to the Zoning Board for review, so Ms. Mullins suggested that <br /> the Commission not close the hearing until that is resolved and confirmed. <br /> On a motion by Ms. Dohan and seconded by Ms. Ladd, the Commission voted 7-0 by roll call <br /> vote to continue the hearing to the January 19, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:45 PM (1:08:28 for LexMedia Recording) <br /> ViewPoint Cloud Permit# CN0I-20-34, DEP#201-1205 <br /> Notice of Intent, 52 Hartwell Avenue <br /> Applicant: Eversource Energy Service Co. <br /> Project: the installation of approximately 2,028 linear feet of new underground duct line to bring <br /> additional electrical circuits from Eversource's existing Hartwell Substation 533 on Hartwell Ave <br /> to the MIT Lincoln Laboratory facility on Wood Street in Lexington, MA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.