Laserfiche WebLink
Referring to plans L1.1 and L2.1, Ms. Desilets described that there are alternate pathways being <br /> shown on the left side of the plans from the connection on Lowell Street. The goal is to have as <br /> much of this trail accessible as possible. Ms. Desilets added that they are taking the connection <br /> that shows towards the beach side and creating a connecting point between the existing trails, <br /> and, although it will require regrading and removal of vegetation, it is mostly burning bush. It <br /> will use a portion of the existing trail but make a connection closer to the beach area, and when <br /> the beach is open, there will be an accessible connection up to Lowell Street. <br /> Referencing the Lexington Engineering report, Mr. Mustain confirmed that they did follow the <br /> existing conditions for the areas in Lexington. Mr. Hamilton suggests that it would benefit the <br /> applicant to get together with the Engineering Department to clarify the items on the <br /> memorandum. <br /> Mr. Marcus asks that the Lexington Conservation Commission coordinate with the Town of <br /> Arlington on the issuance of the Orders of Conditions, if and when approved. Mr. Marcus would <br /> like the orders to match, so that there will be just one set of conditions for the Contractors to <br /> work with. Ms. Mullins confirmed that she will work with the Town of Arlington to make this <br /> happen. <br /> Ms. Desilets will provide a highlighted plan to show where the trails are shifting. <br /> On a motion by Ms. Ladd and seconded by Ms. Samuels, the Commission voted 5-0 by roll call <br /> vote to continue the hearing to the January 19, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> Mr. Bitsko and Mr. Beuttell both recused themselves from the discussion and vote. <br /> 7:36 PM (59:05:00 for LexMedia Recording) <br /> ViewPoint Cloud Permit#AOOC-20-13, DEP#201-1190, CNOI-20-20 <br /> Amendment to Order of Conditions, 11 Norton Road <br /> Applicant: Speedwagon Partners, LLC <br /> Project: Expansion of the approved covered porch located along the front(western) facade <br /> resulting in a 140+/- square foot increase in impervious surface. <br /> Documentation Submitted: <br /> — Letter Describing Requested Amendments;prepared and signed by Richard Kirby, LEC <br /> Environmental; dated December 15, 2020 <br /> — Site Plan dated July 15, 2020 and revised through December 4, 2020;prepared by: <br /> Frederick W. Russell, PE <br />