|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2020-02-24-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2020
>
2020-02-24-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 3:15:31 PM
Creation date
4/13/2020 3:13:47 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> ViewPoint Cloud Permit 4AOOC-20-1 <br /> DEP 1042 <br /> Amendment to Order of Conditions, 7 Crosby Road <br /> Hastings School <br /> Applicant: Ameresco, Inc. o/b/o Town of Lexington <br /> Project: Installation of solar carport <br /> Mr. Stephen Herzog, project engineer with Wood, Inc. and Mr. Jackson Dowdy with Ameresco <br /> presented before the Commission. <br /> Concerns of the Commission: <br /> - How many trees are going to be removed? <br /> Response of the Applicant: <br /> - The applicant did not know but any tree that is to be removed will be replaced. <br /> On a motion by Ms. Ladd and seconded by Mr. Langseth, the Commission voted 5-0 to continue <br /> the hearing until March 9h, 2020 at the applicant's request. <br /> ViewPoint Cloud Permit 4AOOC-20-2 <br /> DEP 201-1082 <br /> Amendment to Order of Conditions, 20 Pelham Road <br /> Lexington Children's Place <br /> Applicant: Ameresco, Inc. o/b/o Town of Lexington <br /> Project: Installation of solar carport <br /> Mr. Stephen Herzog, project engineer with Wood, Inc. and Mr. Jackson Dowdy with Ameresco <br /> presented before the Commission. <br /> On a motion by Ms. Samuels and seconded by Ms. Ladd, the Commission voted 5-0 to continue <br /> the hearing until March 9h, 2020 at the applicant's request. <br /> DEP 201-1163 BL 1118 <br /> ViewPoint Cloud 4CNOI-19-27 <br /> NOI, 91 Hartwell Avenue <br /> Applicant: John Cappellano <br /> Project: Construction of lab and office building, above ground parking garage and associated <br /> infrastructure <br /> Mr. Richard Kirby, wetland scientist with LEC Environmental and Mr. Paul Finger presented <br /> before the Commission. The applicants have applied to the Planning Board for approval. The <br /> building is proposed to be outside of the 25 foot buffer zone. The proposed garage has been <br /> pulled mostly outside of the 25 foot buffer zone. The grades below the lab office building were <br /> lowered to provide additional compensatory flood storage. The wetland replication area was <br /> expanded. The stream channel was redesigned to replicate a more natural flow path. A "blue <br />
The URL can be used to link to this page
Your browser does not support the video tag.