|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2019-04-29-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2019
>
2019-04-29-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 12:56:33 PM
Creation date
7/8/2019 3:50:44 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEP # 201-XXXX BL <br />NOI, 758 Marrett Road <br />Applicant: Minuteman Vocational High School <br />Project: Construction of synthetic tuft athletic fields within the 100-foot Buffer Zone <br />Previous Meeting: 2-25-2019, 3-25-2019, 4-8-2019, 4-22-2019 <br />*Request for continuance until May 13, 2019 at the applicant’s request <br /> <br />On a motion by Mr. Wolk and seconded by Ms. Dohan, the Commission voted 6-0 to <br />continue the hearing at the applicant’s request until May 13, 2019. <br /> <br />DEP # 201-1126 BL 1083 <br />NOI, 6 Blinn Road <br />Applicant: Lauren Dillon <br />Project: Proposed raze and rebuild of a single family dwelling within BVW and the 100-foot <br />Buffer Zone <br />Previous Meeting: 3-11-2019 <br /> <br />Ms. Lauren Dillon and Wesley Leighton presented before the Commission. <br /> <br />Ms. Dillon stated that she is before the Commission in order to verify that the Commission is <br />satisfied with the wetland delineation. Ms. Dillon presented new plans which entirely remove <br />the originally proposed driveway and walkway and eliminates all structures in the rear of the <br />dwelling (i.e., deck, stairs). Ms. Dillon described the changes in impervious surface in relation <br />to the revised submittal. <br /> <br />Mr. Wolk asked if Mr. Crossman had taken any soil samples in the front corner of the <br />property. <br /> <br />Ms. Dillon stated that several samples were taken close to the property line but not where Mr. <br />Wolk was referring to. <br /> <br />Ms. Mullins stated that she went out to 6 Blinn Road with Dave Crossman and Stamski & <br />McNarry to conduct test pits and observe the wetland boundary. The wetland delineation was <br />determined to directly abut the rear edge of the dwelling. The revised wetland delineation was <br />submitted to the Commission. There is a gas line along the edge of the property which <br />restricted test pit exploration but it was confirmed that the wetland delineation was possibly <br />altered during installation of the gas line. Ms. Mullins stated that on the opposite side of the <br />property the soils were definitely hydric which moved the previous delineated wetland line <br />up. <br /> <br />Ms. Dohan asked if a basement was being proposed. <br /> <br />Ms. Dillon stated that no basement is proposed. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.