Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-08-16-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-08-16-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
9/20/2018 1:24:25 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The slide shows the SD, DD, 60% CD, and 90% cost estimates reconciled with the comparisons. <br /> Overall the 90% CD estimate reconciliation shows a revised assumed total and a variance from <br /> budget. The assumed total is $52,971,525 with a variance of$1,893. <br /> M. Burton reviews the Estimate Comments slide. This slide shows: <br /> • Estimate adjusts design contingency to $100,000 <br /> • Estimate adjusts Escalation contingency to $250,000 <br /> • Reconciled estimates showed savings of approx. $635k <br /> • Current budget addressed Sitework issues identified during Early Release Package <br /> Boulders $3k <br /> Mulch $8k <br /> Playground revisions $20k <br /> Unsuitable soil removal and import (Actual) $400k <br /> Unsuitable soil removal and import (Projected) $200k <br /> Total: $631 k <br /> M. Burton reviews Total Project Budget slide. The slide shows: <br /> Total Construction Cost: $52,971,525 <br /> Soft Costs: $10,306,000 <br /> Owner's Contingency: $2,000,000 <br /> Total Project Budget: $65,277,524 <br /> After reviewing 90% reconciliation information M. Burton reviews remaining VE items slide. After <br /> reconciliation the team reviewed and added new VE items to the list that can be taken. M. Burton <br /> states that N.1, remove spray foam from exterior cavity wall with a value of$110,148 should be <br /> taken since the building already has a moisture vapor barrier. The spray foam is an additional step <br /> that is not needed. DiNisco has reviewed with the commissioning agent, as part of the envelope it is <br /> not required based on their energy model or the R value. DiNisco to further review with LEED <br /> engineer and LEED consultant to determine if necessary. Further N.2 from the VE was also <br /> recommended to be taken, remove 4" chain link fence from north and south elevation with a value of <br /> $35,000. The fence is an added cost that is not needed and or required on the north and south side <br /> of the property. <br /> M. Burton states that the prequalification team evaluated all SOQ's received for the public trade <br /> qualification process. All but one contractor was prequalified. Drawings will be available to the <br /> contractors on 9/10/18. <br /> A motion was made by J. Himmel and seconded by D. Perry to approve the 90% CD reconciliation <br /> of$52,971,525 and to submit the 90% CD package to the MSBA. Discussion: J. Himmel asks that <br /> the approval be based on what was approved back at SD with a value of$52,973,418. Vote: All in <br /> favor. Motion passes. <br /> PBC Meeting 08.16.18 3 <br />