|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-08-16-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-08-16-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
9/20/2018 1:24:25 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Westview Cemetery—Justin Humphrey(TBA Architects), Dave Pinsonneault (DPW <br /> Justin's presentation reviewed the Cemetery Building Program, which does not include a <br /> crematorium at this time. As the original proposed plan showed, it will be a single story building <br /> consisting of administrative space, a 4 bay garage & maintenance area, and outdoor material <br /> storage bins. <br /> • The front entrance has been reworked for the potential of adding a crematorium or pavilion in the <br /> future. <br /> • The main entrance to the building would now be off Westview Street. The building's exterior is <br /> proposed with metal clad and brick materials. <br /> PBC asked about the utilities. Justin stated it will be an electric building, (gas not being used), with <br /> water coming in off of Westview. The building will have its own septic system. There is an estimated <br /> $300,000 savings taking gas and sewer connection out of the plan. <br /> PBC suggested that it might be prudent to size the septic system for a possible expansion. <br /> It was stated an AD HOC committee is being formed to review the crematorium. Town Meeting <br /> member Narain Bahtia spoke, giving information on the crematorium and stated he is working on a <br /> Warrant Article to appear at the next town meeting. He stated that only one retort would be required. <br /> DPW stated they would like to get funding through construction for this project at the Fall Town <br /> Meeting and get the process going. Dave stated they would like to break ground by spring and be <br /> done before winter. <br /> 3. Hastings School — Michael Burton (Dore & Whittier), Frank Morse (Walsh) <br /> Minutes submitted by Christina Shefferman <br /> Hastings portion of meeting started at 8:35 pm. <br /> M. Burton starts meeting by following power point presentation regarding 90% Construction <br /> Documents of the Maria Hastings Elementary School Project. <br /> The agenda followed stated: <br /> • 90% CD Cost Estimate Reconciliation Recap <br /> • Construction Budget Comparison/Progression <br /> • Total Project Budget <br /> • Value Engineering <br /> • Approval to submit 90% CD Submission <br /> Reconciliation Recap: <br /> • Reconciliation held w/ DiNisco, Walsh, & DWMP on 8/8/18 @ WBI Office <br /> • Estimates from Walsh Brothers and AM Fogerty were reconciled to a >1% Variance <br /> • AMF Reconciled estimate to be used for 90% CD Submission to MSBA(August 13th, 2018) <br /> • Financial approvals to be sent o MSBA upon PBC approvals <br /> M. Burton goes on to review Budget Development (side-by-side) comparison slide. <br /> PBC Meeting 08.16.18 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.