|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-04-12-PBC-min.rev
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-04-12-PBC-min.rev
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
9/20/2018 1:20:31 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Timeline <br /> Approval of this iGMP1 allows CM to award the site work immediately upon approval to secure <br /> contractors (manpower, materials & equipment)for this summer's work as well as to begin the <br /> submittal and approval process for materials. <br /> Timeline: <br /> Award site contractor: 4/13/18 <br /> Submittal/shop drawing process: Mid/end May <br /> Geothermal wells: 6/8/18 <br /> Enables foundation work to begin October 18 <br /> GMP Development Timeline <br /> Based on the utilization of Early Release Packages (ERPs) the project team anticipates 3 interim <br /> GMPs prior to the 4th and final GMP <br /> Timeline: <br /> iGMP1 - 4/12/18 Earthwork, Geothermal, ledge removal, site utilities <br /> iGMP2 - 5/10/18 Foundations/Steel, landscape, playground surfacing, misc. site improvements <br /> iGMP3 - 10/11/18 Mason, misc. metals, glazing, thermal/moisture protection, finishes, elevator, fire <br /> suppression, plumbing, HVAC, electrical <br /> Final GMP-12/13/18 Existing conditions, rough/finish carpentry, storefront curtain wall, (remaining) <br /> thermal,/moisture protection, non-trade finishes, specialties, equipment <br /> Financial Summary for iGMP1 <br /> AM.Fogerty Estimate from DD (control) $8,195,896 <br /> Walsh bid amount $8,943,555 <br /> Delta $747,659 <br /> Contingency (this package represents 18% of the scope to buy) <br /> Design Contingency ($2,060,793 x 18%) <$381,247> <br /> Escalation Contingency ($1,114,374 x 18%) <$206,159> <br /> Remaining Delta $160,253 <br /> M. Burton asks the PBC whether any members would like to be involved in the upcoming <br /> prequalification process of the trade contractors. A. Clark from the PBC said he would like to be <br /> involved in the process. <br /> Motion was made by C. Favazzo, and seconded by P. Coleman to approve the iGMP1 for <br /> the Maria Hastings Elementary School Project. All in favor: yes. Motion passes. <br /> Hastings portion of meeting ended at 8:35 pm. <br /> PBC Meeting 04.12.18 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.