|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-04-05-ATM-CPC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2010
>
Reports
>
2010-04-05-ATM-CPC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 2:02:56 PM
Creation date
7/25/2018 9:01:21 AM
Metadata
Fields
Template:
Archives
Year
2010
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Community Preservation Committee report to Town Meeting ATM 2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8 (n) <br /> Project: Police Station Ventilation System <br /> CPA Category: Historic Resources <br /> Amount Requested: $31,700 <br /> Amount Recommended: $31,700 <br /> CPC Vote: (6-3) <br /> Project Description: <br /> This project is requesting funds to replace the Police Station lower level ventilation unit <br /> with a higher rated fan and motor to achieve required ventilation. The existing unit is <br /> undersized and cannot deliver design airflows. As a result, the lower level, including <br /> holding cells, is not being adequately ventilated, resulting in insufficient fresh air and <br /> odor control. In addition, air conditioning will be installed to control relative humidity <br /> levels in the summer months. This project will also include an update of the <br /> Massachusetts Historical Commission Inventory Form "B". <br /> Project Goals and Objectives: <br /> Police Station audits have reported that the ventilation of the holding cells is inadequate. <br /> The goal of the project is to achieve design flow rates. <br /> Project Benefit: <br /> The existing unit cannot deliver required airflow due to the pressure drop of the installed <br /> ductwork. The new fan and motor will be rated to operate with the installed ductwork and <br /> achieve design airflow. The existing system was installed in 1994.; during the past fifteen <br /> years, the failure of the system to adequately vent the cell-block has been an impediment <br /> to operations and an unhealthy condition for detainees. This lack of air flow must be <br /> corrected. Outside air is heated when necessary, but not cooled. During summer months, <br /> lack of air conditioning allows saturated air to condense on cool, sub grade surfaces. <br /> Funding Request: <br /> The project requests $31,700 in CPA funds to be used to implement extraordinary repairs <br /> to the Police Station's lower level HVAC and to update the Massachusetts Historical <br /> Commission Inventory Form `B". <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.