|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-04-05-ATM-CPC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2010
>
Reports
>
2010-04-05-ATM-CPC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 2:02:56 PM
Creation date
7/25/2018 9:01:21 AM
Metadata
Fields
Template:
Archives
Year
2010
Author or Source
Community Preservation Committee
Department
Town Clerk
Keywords or Subject
Community Preservation Committee report to Town Meeting ATM 2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE S {m} <br /> Project: Cary Memorial Building/TOB HVAC Controls Upgrade <br /> CPA Category: Historic Resources <br /> Amount Requested: $35,000 <br /> Amount Recommended: $35,000 <br /> CPC Vote: (9-0) <br /> Project Description: <br /> The Department of Public Facilities is requesting $35,000 in CPA funds to perform <br /> extraordinary repairs at the Town Office Building and Cary Memorial Building to <br /> upgrade existing pneumatic controls to digital controls and to add new valves, <br /> thermostats and software to enable more efficient operation of the HVAC system. <br /> Project Goals and Objectives: <br /> The goals and objectives of this project include installing digital temperature controls in <br /> the Cary Memorial Building that will enable schedules to be developed to control space <br /> temperatures that coincide with scheduled occupancies. In addition, digital thermostats <br /> and automatic control valves will also be installed at Cary Memorial Building to control <br /> individual spaces to Lexington Energy Use Guidelines. The final objective is to integrate <br /> the digital controls for the Town Office Building with the new digital controls for the <br /> Cary Memorial Building in order to operate the heating and cooling plant in Cary <br /> Memorial Building, (which serves both buildings), more efficiently. <br /> Project Benefit: <br /> The existing Cary Memorial Building pneumatic temperature controls and manually <br /> operated zone valves inhibit efficient operation of the heating and cooling system, <br /> resulting in poor occupant comfort. The proposed improvements to the system will result <br /> in improved temperature control for public uses of the building and in reduced energy <br /> costs of approximately $5,000 annually. <br /> Funding Request: <br /> The project requests $35,000 in CPA funds to be used to implement digital HVAC <br /> controls, thermostats, automated zone valves, and software for improved HVAC <br /> operation. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.