Laserfiche WebLink
ARTICLE S {m} <br /> Project: Cary Memorial Building/TOB HVAC Controls Upgrade <br /> CPA Category: Historic Resources <br /> Amount Requested: $35,000 <br /> Amount Recommended: $35,000 <br /> CPC Vote: (9-0) <br /> Project Description: <br /> The Department of Public Facilities is requesting $35,000 in CPA funds to perform <br /> extraordinary repairs at the Town Office Building and Cary Memorial Building to <br /> upgrade existing pneumatic controls to digital controls and to add new valves, <br /> thermostats and software to enable more efficient operation of the HVAC system. <br /> Project Goals and Objectives: <br /> The goals and objectives of this project include installing digital temperature controls in <br /> the Cary Memorial Building that will enable schedules to be developed to control space <br /> temperatures that coincide with scheduled occupancies. In addition, digital thermostats <br /> and automatic control valves will also be installed at Cary Memorial Building to control <br /> individual spaces to Lexington Energy Use Guidelines. The final objective is to integrate <br /> the digital controls for the Town Office Building with the new digital controls for the <br /> Cary Memorial Building in order to operate the heating and cooling plant in Cary <br /> Memorial Building, (which serves both buildings), more efficiently. <br /> Project Benefit: <br /> The existing Cary Memorial Building pneumatic temperature controls and manually <br /> operated zone valves inhibit efficient operation of the heating and cooling system, <br /> resulting in poor occupant comfort. The proposed improvements to the system will result <br /> in improved temperature control for public uses of the building and in reduced energy <br /> costs of approximately $5,000 annually. <br /> Funding Request: <br /> The project requests $35,000 in CPA funds to be used to implement digital HVAC <br /> controls, thermostats, automated zone valves, and software for improved HVAC <br /> operation. <br /> 18 <br />