Laserfiche WebLink
APPROPRIATION COMMITTEE-ATM 20 t <br /> Cost Breakdown <br /> Item Cost Previous This article <br /> Appropriation <br /> Hard Costs <br /> Building Construction Cost $7,658,556 $0 $7,658,556 <br /> Building Demo+HazMat Costs $684,788 $684,788 $0 <br /> Sitework $3,417,385 $975,000 $2,442,385 <br /> Subtotal Hard Costs $11,760,729 $1,659,788 $10,100,941 <br /> Soft Costs <br /> Study/Fees/On-site construction Rep/ $2,068,613 $1,301,500* $767,113 <br /> Testing <br /> Furniture, Fixtures&Equipment plus $445,000 $0 $445,000 <br /> Technology <br /> Subtotal Soft Costs $2,513,613 $1,301,500 $1,212,113 <br /> Construction & Owner Contingencies $805,000 $120,212** $684,788 <br /> Total $15,079,342 $3,081,500 $11,977,842 <br /> * Includes the amount from the Spring 2017 STM ($581,000) and the portion from the Fall 2017 STM <br /> assigned to this item($720,000). <br /> ** Includes the amount assigned to this item from the Fall 2017 STM appropriation ($115,000)plus the <br /> rounding error of$5,212 due to the appropriation of$2,500,000 at the Fall 2017 STM while the estimated <br /> cost was $2,494,788. <br /> The Committee recommends approval of this request(9-0). <br /> Article 13: Appropriate for 45 Bedford Street/Fire Station Replacement <br /> Funds Requested Funding Source Committee Recommendation <br /> $18,820,700 excluded debt Approve (9-0) <br /> This article seeks appropriation of$18,820,700 for the demolition of the current Fire Headquarters at 45 <br /> Bedford St. and the construction of a new Fire Headquarters building at the site. <br /> This appropriation of funds represents the final step, barring a cost overrun, towards replacement of the <br /> current building at the intersection of Bedford St. and Worthen Road with a new larger building that will <br /> better serve the needs of the Fire Department for many years into the future. The numerous deficiencies <br /> of the current building include, among others, lack of sufficient room for equipment, personnel, and <br /> workspaces, a floor under the equipment bays that is failing and is held up with temporary supports, and a <br /> leaky basement that has had problems with mold and mildew. The justification for replacement of the <br /> Fire Headquarters station is documented in detail elsewhere. This Committee briefly reviewed the ra- <br /> tionale in our "Report to the Special Town Meeting on September 21, 2016" dated September 14, 2016, <br /> under Article 2016-5.2. A brief synopsis of the rationale may also be found in the report of the Capital <br /> 36 <br />