APPROPRIATION COMMITTEE-2018 ATM <br /> ments (@ a 4% interest rate) are expected to be in the range of $225,000 per year. A majority of this <br /> Committee is in support of the request under this article. <br /> A minority of this Committee is of the opinion that construction funds should only be appropriated once <br /> detailed design is complete, construction documents have been issued, and an accurate cost estimate has <br /> been developed. <br /> The Committee recommends approval of this request(6-3). <br /> Article 12: Appropriate for Lexington Children's Place Construction <br /> Funds Requested Funding Source Committee Recommendation <br /> $11,997,842 excluded debt Approve (9-0) <br /> This article seeks $11,997,842 for design and construction for the new Lexington Children's Place (LCP) <br /> to be located at 20 Pelham Road. The preliminary design of the preschool shows 7 classrooms in a build- <br /> ing with a floor area of 18,850 square feet. The debt service for the project may be excluded from Propo- <br /> sition 2.5 limits on the tax levy since this was approved by the voters in December 2017. <br /> The LCP provides services to preschool children (ages 2 years 9 months to 5 years old), including both <br /> children with special needs who qualify under the state mandate for free educational services, and typical- <br /> ly-developing children whose families pay tuition. The LCP currently shares space in the Harrington <br /> School and School Administration(old Harrington) buildings. <br /> As of March 1, 2018, LCP had an enrollment of 85 students, of which 39 are special education students <br /> taking up 60 slots, with 46 general education students taking up 71 slots. Note that morning and afternoon <br /> each count as one slot, with some students attending either morning or afternoon and some attending <br /> both. <br /> As of March 10, 2018, the total project cost is estimated to be $15,079,342. The table below lists all ap- <br /> propriations for this project including two previous appropriations and the current request covered in this <br /> article. <br /> Appropriation Purpose <br /> STM 2017 Spring $581,500 Design Funds for LCP <br /> STM 2017 Fall $2,500,000 Design, engineering(including the demolition of the existing <br /> structure,removal of hazardous material, and some site work), <br /> and architectural services <br /> ATM 2018 Spring $11,997,842 Design, construction, site work, and completion of the project <br /> Total $15,079,342 <br /> Note that this request is consistent with the expected future appropriation stated during the fall 2017 spe- <br /> cial town meeting, which was $11,797,842 with possible additional site costs in the $100,000 - $200,000 <br /> range due to moving the building footprint further away from the wetland. <br /> As of March 10, 2018, the construction documents are roughly 75% complete. The bid documents are <br /> almost ready for advertisement for services to accomplish the demolition of the existing building and to <br /> do required site work. The construction documents and the demolition of the existing building are cov- <br /> ered by the appropriation from the fall 2017 Special Town Meeting. <br /> 35 <br />