|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-03-26-AC-ATM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2018
>
Reports
>
2018-03-26-AC-ATM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:22:36 PM
Creation date
4/4/2018 1:18:54 PM
Metadata
Fields
Template:
Archives
Year
2018
Author or Source
Appropriation Committee
Department
Town Clerk
Keywords or Subject
Town Meeting APPROPRIATION COMMITTEE REPORT TO THE 2018 ANNUAL TOWN MEETING
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROPRIATION COMMITTEE-2018 ATM <br /> ments (@ a 4% interest rate) are expected to be in the range of $225,000 per year. A majority of this <br /> Committee is in support of the request under this article. <br /> A minority of this Committee is of the opinion that construction funds should only be appropriated once <br /> detailed design is complete, construction documents have been issued, and an accurate cost estimate has <br /> been developed. <br /> The Committee recommends approval of this request(6-3). <br /> Article 12: Appropriate for Lexington Children's Place Construction <br /> Funds Requested Funding Source Committee Recommendation <br /> $11,997,842 excluded debt Approve (9-0) <br /> This article seeks $11,997,842 for design and construction for the new Lexington Children's Place (LCP) <br /> to be located at 20 Pelham Road. The preliminary design of the preschool shows 7 classrooms in a build- <br /> ing with a floor area of 18,850 square feet. The debt service for the project may be excluded from Propo- <br /> sition 2.5 limits on the tax levy since this was approved by the voters in December 2017. <br /> The LCP provides services to preschool children (ages 2 years 9 months to 5 years old), including both <br /> children with special needs who qualify under the state mandate for free educational services, and typical- <br /> ly-developing children whose families pay tuition. The LCP currently shares space in the Harrington <br /> School and School Administration(old Harrington) buildings. <br /> As of March 1, 2018, LCP had an enrollment of 85 students, of which 39 are special education students <br /> taking up 60 slots, with 46 general education students taking up 71 slots. Note that morning and afternoon <br /> each count as one slot, with some students attending either morning or afternoon and some attending <br /> both. <br /> As of March 10, 2018, the total project cost is estimated to be $15,079,342. The table below lists all ap- <br /> propriations for this project including two previous appropriations and the current request covered in this <br /> article. <br /> Appropriation Purpose <br /> STM 2017 Spring $581,500 Design Funds for LCP <br /> STM 2017 Fall $2,500,000 Design, engineering(including the demolition of the existing <br /> structure,removal of hazardous material, and some site work), <br /> and architectural services <br /> ATM 2018 Spring $11,997,842 Design, construction, site work, and completion of the project <br /> Total $15,079,342 <br /> Note that this request is consistent with the expected future appropriation stated during the fall 2017 spe- <br /> cial town meeting, which was $11,797,842 with possible additional site costs in the $100,000 - $200,000 <br /> range due to moving the building footprint further away from the wetland. <br /> As of March 10, 2018, the construction documents are roughly 75% complete. The bid documents are <br /> almost ready for advertisement for services to accomplish the demolition of the existing building and to <br /> do required site work. The construction documents and the demolition of the existing building are cov- <br /> ered by the appropriation from the fall 2017 Special Town Meeting. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.