Question asked about work after start of school. Work will continue in closed off corridor on 2nd <br />floor during the school day, and second shift for punch list. Modulars to stay and be a swing space <br />until 2018. <br />Clarke Update — Ryan DiRico of BOND <br />Ryan discussed the vehicular precast bridge, and building a new brook bottom pre -installation <br />helped the bridge move along quicker. Walls at the main entrance to the administrative office have <br />been placed and back filled. The plaza is 50% sub -graded and precast benches still need to be <br />installed. <br />• Interior VCT, lockers & trim installed, and ceiling tiles installed in all classrooms. Science <br />Rooms show as done. <br />• Music and Band space renovation has lots of work with acoustic sound ceiling. Mechanicals <br />still being worked on. Almost finished with in -wall electrical. All plumbing in -wall inspections <br />completed. <br />• Board and tape walls, sand and tape this weekend (29th), and planning to be ready by <br />August 1st. <br />• Still a lot of work to get first floors finished. Furniture is on site and still arriving. <br />• Air quality will be verified thru testing before start of school. <br />Motion to adjourn was made and seconded: Meeting adjourned at 9:10pm. <br />PBC Meeting 07.26.17 3 <br />