DPF stated we will move forward on the LCP with consideration for LCC expansion. Historic <br />restrictions limit where building(s) can be placed. There will be a meeting with the Historical Society <br />on how they view restrictions. The Carriage House could be moved, but would need to stay on site. <br />It was commented on the importance of safe pedestrian traffic with lots of children traveling between <br />LCP and LCC. <br />3. Clarke/Diamond Update — Ryan DiRico, Mike Dumaresg, Jerry Hammersley, Mike Lambert, Alan <br />Steinberg (BOND), Paul (HILL) & Ken DiNisco (DiNisco Designs) <br />With many of the project's work still needing to be completed, BOND representatives provided the <br />Clake/Diamond updates. <br />Diamond Update — Jerry Hammersley of BOND <br />MEP subs working on getting equipment on-line getting ready for the Commissioning Agent. <br />Classroom wing finishes are done, waxing floors tomorrow, railings in stairwells are getting done and <br />we are in good shape all around on the addition. <br />Jerry discussed the work that still needs to be finished up in various areas. This includes electrical, <br />drywall, ceiling tiles, floors, kitchen, overhead HVAC piping and chill beams. Cleaners are coming <br />in on 2nd shift when trades are not there. <br />Ken stated that all school equipment needs to be in place by Monday 7/31. Floors need to be <br />waxed and furniture in place ready for teachers August 21 st. All inspections to date have been <br />done. Lots of finish work still needs to be done. Canopy over main entrance still needs to be closed <br />in. <br />Bond stated the Fire Alarm is live now. <br />Site work is in good shape and a little under halfway done completing 400'-600' feet of curbing a <br />day. Phasing plan to have guys start to work on formwork and rebar to get sidewalks done. <br />Landscaping actively on site. Marbardy is placing loam as he moves along, and will be ready to <br />spread once sidewalks are completed. <br />Bond stated subs are working long shifts averaging 110 workers on site. <br />The rest of the doors and frames have been delivered. Bond stated unforeseen issues with conflicts <br />above the ceilings caused some delays but all issues appear to be resolved. <br />PBC asked what the big worries are. <br />It was stated the boiler room with hot water will go on-line in September but not for the start of <br />school. <br />DPF stated the commissioning is going well, but concerns are a Sept/Oct. final commissioning. Ken <br />commented the big issue with commissioning is indoor air quality. And documentation needed <br />Certificate of Occupancy. <br />PBC asked if this information has been conveyed to the School Department and Superintendent. <br />Yes. <br />PBC Meeting 07.26.17 <br />