Laserfiche WebLink
140 <br />J5177SRH�Y� TOWN OF LEXINGTON <br />x ° Permanent Building Committee <br />aim oW� <br />A Permanent Members <br />J an' <br />APRIL19' Chairman: Jon Himmel <br />1NG1 Peter Johnson, Dick Perry, Carl Oldenburg, Philip Coleman, Charles Favazzo, Howard Hobbs <br />Project Specific Members <br />Clarke & Diamond Schools Hastings Elementary <br />Margaret Coppe Curt Barrentine <br />Edwin Goodell Andrew Clarke <br />July 26, 2017 <br />Fire Station Visitors Center Pelham Road <br />Robert Cunha Joel Berman Hank Manz <br />Joseph Sirkovich Peter Kelly Teresa Wilson <br />Members Present: Jon Himmel, Dick Perry, Carl Oldenburg, Philip Coleman, Charles Favazzo, <br />Howard Hobbs, Margaret Coppe, Edwin Goodell, Curt Barrentine, Andrew Clarke, <br />Hank Manz, Teresa Wilson <br />Members Absent: Peter Johnson <br />DPF Staff: Patrick Goddard/Director of Public Facilities, Mark Barrett and Ann Marie Ponzini <br />7:00 - The meeting was called to order. <br />1. Hastings Update — Trip Elmore & Mike Burton (Dore & Whittier). Donna DiNisco (DiNisco Design <br />(See Attached) <br />2. LCP/Pelham Road Update — Donna DiNisco & Rick Rice (DiNisco Design) <br />Donna discussed a slide presentation that showed the Existing Site Plan, Two Site Plan Options and <br />LCP Master Plan Recommendations. <br />• The Existing Plan confirmed wetlands and vernal pool locations with setbacks of 50' and 100' <br />feet. It also showed ledge, existing detention basin, and a steep slope from Pelham Road. <br />• Option Awas dismissed due to LCP location, LCC expanded parking was undesirable and <br />expansion opportunities were lacking. <br />• Option B provided a preferred location for LCP and expanded parking. LCC showed better <br />expansion opportunities. LCC expansion could possibly have a playground that could be <br />shared with LCP. <br />It was stated a VRF, (Variable Refrigerant Flow), system would be used for LCP. <br />Two LCP Master Plan Options were shown. One option relocates LCC parking, provides for an LCC <br />expansion location and moderate ledge removal. The second option did not displace LCC parking, <br />major ledge removal and provides and an LCC expansion location. <br />Timeline was discussed. It was stated that for the fall Town Meeting, LCP would likely be bundled <br />with the Hasting's School Project and Fire Station Project. The LCC expansion would be further <br />evaluated as a future work. <br />PBC asked about access restrictions by the Scottish Rite if any. DPF stated the Scottish Rite were <br />favorable with parking next to them, but asked about exiting via Marrett Road. <br />PBC asked if we have clear knowledge of what LCC's needs are. Designers confirmed. <br />