Laserfiche WebLink
2. Hastings Update — Trip Elmore (Dore & Whittier). Donna DiNisco & Vivian Lowe (DiNisco Design <br />(See Attached) <br />3. Pelham Update — Donna DiNisco & Vivian Lowe (DiNisco Design <br />The direction for this project is to demolish the existing building and construct a new LCP on the site, <br />being mindful of future expansion and where LCC would be located. A site survey is scheduled to be <br />done along with test pits. Traffic limitations on Pelham Road need to be further reviewed and a few <br />weeks needed to finalize. <br />DPF: Deliverables by July 20th describing recommendations for LCP and a Master Plan for LCC by <br />the end of August. Meeting with the Budget Summit at the end of August, and discussions with <br />Public Safety would take place around the same time frame. <br />DPF: Historic restrictions exist with the purchase of Pelham Road, and where we can develop. <br />It was commented that limitations for accessing the property is a concern and Pelham Road ability to <br />handle traffic. <br />Intent is to not alter the road, but possible use Pelham Road for entering only or exiting out. (one <br />way system). This will be addressed as part of the 2nd study at the end of August (traffic/safety). <br />Motion to adjourn was made and seconded: Meeting adjourned at 8:35pm. <br />PBC Meeting 06.28.17 <br />