Laserfiche WebLink
• Camilla Place was looked at in terms of widening the sidewalk or otherwise improving the <br />pedestrian circulation from parking to the building, a number of ideas were discussed that the <br />architects will develop. <br />• There was discussion on whether to filter down to one design scheme for the next PBC meeting <br />to include HDC (Historic District Committee), although the end result was to keep two design <br />options going forward, to receive HDC's informal input. <br />Jeff updated the PBC on LEED checklist status. <br />• MEP Narrative discussed, looking at geothermal systems, VRF systems and traditional gas fired <br />equipment. <br />• Radiant heat in floor first choice for apparatus and equipment type spaces. <br />• Checklist review shows clearly that a Silver Rating is possible; trying to determine if Gold is <br />reachable. <br />Fire Project will need discussion in near future on procurement method of Design Bid Build versus <br />CM. <br />Motion to adjourn was made and seconded: Meeting adjourned at pm 9:00pm. <br />PBC Meeting 06.14.17 <br />2 <br />