|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-05-11-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2017
>
2017-05-11-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:59 PM
Creation date
8/2/2017 9:10:49 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee Meeting <br />Maria Hastings Elementary School Building Project <br />SBC MEETING MINUTES <br />DATE OF MEETING: May 11, 2017 at 7:30P.M. at Community Center, Rm 425, Lexington MA <br />PROJECT: Maria Hastings Elementary School Building Project <br />Dore & Whittier Project #MP16-0112 <br />SUBJECT: School Building Committee Meeting (D&W#10) <br />ATTENDING: <br />Jon Himmel Lexington PBC Chair <br />Andrew Clarke Lexington PBC <br />Curt Barrentine Lexington PBC <br />Charles Favazzo Lexington PBC <br />Carl Oldenburg Lexington PBC <br />Richard Perry Lexington PBC <br />Howard Hobbs Lexington PBC <br />Pat Goddard Lexington DPF <br />Mark Barrett Lexington DPF <br />Kate Colburn School Committee Liason <br />Peter Kelley Selectmen Liason <br />Louise Lipsitz School Principal <br />Trip Elmore DWMP <br />Rachel Milaschewski DWMP <br />Donna DiNisco DiNisco Design <br />Vivian Low DiNisco Design <br />1. Call to order at 7:30 <br />T. Elmore of DWMP made the announcement that the CM Selection Committee for the Maria <br />Hastings ES Project finalized their evaluations and selected Walsh Brothers as Construction <br />Manager. <br />2. Plan Update and Site Development Considerations <br />V. Low reviewed the slides provided in the meeting packet; she explained that there have not been <br />any major design changes made to the building or the site since the Committee had last met. She and <br />D. DiNisco pointed out that they have explored multiple options for Police access around the building, <br />as requested by the Lexington Police Department, but they have not settled on a particular option yet <br />at this time. V. Low explained that the cost difference between the options could range significantly, <br />as it affects the size of the retaining wall which abuts it and could become pricey; it will become <br />clearer which direction to go in once they receive the reconciled SD cost estimate. <br />Furthermore, DiNisco discussed the option of building an access road to Mass. Ave on the upper <br />portion of the site for utility vehicles during construction. The Committee discussed this option and <br />suggested exploring ways to use this road permanently, even after construction. <br />The Design team explained that due to the volume of traffic on Mass. Ave and its location to the <br />bypass over the highway, it may be unsafe to use the access road as a permanent drive, though they <br />reiterated that they will be exploring these options further with the Construction Manager. <br />ANA. E, <br />IAI Irl'I, I.1` <br />AI I-II"G"RI:IS <br />h"aawbuurypor'Y„'MA 0[950 <br />60lverrirroc Snutiaz 11h:1 <br />h178.499.2999 ph <br />97849,h2944 ?Mx <br />waww.wiuiruarsdrwhittkr atrrx <br />
The URL can be used to link to this page
Your browser does not support the video tag.