Laserfiche WebLink
3. Site Security Update <br />V. Low then went on to explain that the Design team has met with their Security Consultant, who <br />offered some suggestions in regards to site safety and security measures (i.e. fencing along drives, <br />card access to building, camera locations, etc.), which they will continue to include into the design. <br />4. Massing Elevation Updates <br />DiNisco then reviewed the elevation images included in the meeting packet, describing their thoughts <br />behind potential material selections and locations of glass, etc. V. Low mentioned that the building <br />has the potential to look very heavy with the classroom wing being 3 stories, and the design team is <br />exploring exterior material options and applications to avoid such a heavy look. <br />The Committee agreed with DiNisco's findings and offered suggestions, which the Design team will <br />review and discuss at their next Design Team Meeting. <br />5. Project Schedule <br />DWMP and DiNisco discussed the meeting schedule leading up to the Schematic Design Submission. <br />T. Elmore explained that in this time there will be a number of PBC meetings, a cost estimate <br />reconciliation, a Budget Summit, and a number of School Committee meetings. <br />Due to the short period of time between the reconciliation and the budget summit, P. Goddard <br />explained that the reconciled estimate may be presented to the School Committee prior to the PBC <br />having an opportunity to hold a meeting. Though the PBC will seethe reconciled estimate before the <br />Budget Summit meeting, the Committee still felt it was important to schedule a special meeting to <br />discuss the estimate beforehand. <br />The Committee then further discussed the list of upcoming meetings and agreed to add a PBC <br />Meeting for Monday, June 5th in order to review the estimates. <br />*The Hastings portion of the PBC meeting ended at 8:50 PM* <br />2 <br />