|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-05-11-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2017
>
2017-05-11-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:59 PM
Creation date
8/2/2017 9:10:49 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Site Security Update <br />V. Low then went on to explain that the Design team has met with their Security Consultant, who <br />offered some suggestions in regards to site safety and security measures (i.e. fencing along drives, <br />card access to building, camera locations, etc.), which they will continue to include into the design. <br />4. Massing Elevation Updates <br />DiNisco then reviewed the elevation images included in the meeting packet, describing their thoughts <br />behind potential material selections and locations of glass, etc. V. Low mentioned that the building <br />has the potential to look very heavy with the classroom wing being 3 stories, and the design team is <br />exploring exterior material options and applications to avoid such a heavy look. <br />The Committee agreed with DiNisco's findings and offered suggestions, which the Design team will <br />review and discuss at their next Design Team Meeting. <br />5. Project Schedule <br />DWMP and DiNisco discussed the meeting schedule leading up to the Schematic Design Submission. <br />T. Elmore explained that in this time there will be a number of PBC meetings, a cost estimate <br />reconciliation, a Budget Summit, and a number of School Committee meetings. <br />Due to the short period of time between the reconciliation and the budget summit, P. Goddard <br />explained that the reconciled estimate may be presented to the School Committee prior to the PBC <br />having an opportunity to hold a meeting. Though the PBC will seethe reconciled estimate before the <br />Budget Summit meeting, the Committee still felt it was important to schedule a special meeting to <br />discuss the estimate beforehand. <br />The Committee then further discussed the list of upcoming meetings and agreed to add a PBC <br />Meeting for Monday, June 5th in order to review the estimates. <br />*The Hastings portion of the PBC meeting ended at 8:50 PM* <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.