Laserfiche WebLink
School Committee (SC) asked if any of the options allow for not using bottle water. It was stated that <br />the Medium and High options do and are stated in the Program Handout. <br />Donna discussed the New Construction Option for LCP. The classroom wing would be demolished <br />and a new LCP would then be built. The LCC renovation options would be kept. There is a lot of <br />flexibility with all options and the programs for both LCP & LCC fit nicely into this space. <br />Recreation Department stated they would like to have cooking classes and the current LCC kitchen <br />does not allow for this. Would LCC program kitchen allow for this? PBC added that the existing <br />kitchen and equipment at Pelham need to be further looked into for Health Department Compliance. <br />It was stated the parking needs that have been identified are substantial, so consideration needs to <br />be taken before adding additional needs to the program. <br />Recreation asked about making a presentation to their board. A meeting date of May 17th has been <br />added. <br />PBC asked if a new LCP was built, would LCP & LCC be 2 separate buildings — YES. <br />It was stated the goal is to have a design by the end of June for submission to TM, providing the <br />best option for the town. A May 23rd meeting is scheduled with BOS/SC, June 8th Abutters meeting <br />and also June 8th Budget summit. <br />2. Hastings Project Update — Trip Elmore & Rachel Milaschewski (Dore & Whittier) <br />(See Attached) <br />Motion to adjourn was made and seconded: Meeting adjourned at pm 9:OOpm. <br />PBC Meeting 05.11.17 2 <br />