Laserfiche WebLink
x0:Peter Johnson, Dick Perry, Carl Oldenburg, Philip Coleman, Charles Favazzo, Howard Hobbs <br />Project Specific Members <br />Hastings Elementary Fire Station Visitors Center <br />Curt Barrentine Robert Cunha Joel Berman <br />Andrew Clarke Joseph Sirkovich Peter Kelly <br />TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Chairman: Jon Himmel <br />Clarke & Diamond Schools <br />Margaret Coppe <br />Edwin Goodell <br />Pelham Road <br />Hank Manz <br />Teresa Wilson <br />May 11, 2017 <br />Members Present: Philip Coleman, Charles Favazzo, Jon Himmel, Howard Hobbs, Carl Oldenburg, <br />Dick Perry, Margaret Coppe, Edwin Goodell, Curt Barrentine, Andrew Clarke <br />Members Absent: Peter Johnson <br />DPF Staff: Patrick Goddard/Director of Public Facilities, Mark Barrett and Ann Marie Ponzini <br />6:30 - The meeting was called to order. <br />Pelham Project Update - Donna DiNisco (DiNisco Designs) <br />A walk through of the Pelham Building was done prior to this meeting. Donna's handouts for <br />discussion included a Feasibility Study, Renovation Option Matrix, Cost Summaries and a Timeline <br />for the Lexington Learning Place (LCP) and the Lexington Community Center (LCC) projects. <br />A breakout of various component options were discussed covering low, medium and high cost <br />options. <br />• The space and cost would be split between the LCP and LCC programs. LCP would have <br />about 20,000 sq. ft. and LCC 24,000 sq. ft. <br />• Multiple cost options were presented for various levels of work to be performed. <br />• The High/Full Program Option would meet the requirements of the program for LCP, <br />providing the desired bathrooms and sinks in the classrooms. <br />• LCC High/Full Program Option would provide a full cooking kitchen, (but no equipment), <br />cafeteria, gym and an updated stage. Woman's and Men's bathrooms with showers and <br />lockers would be provided and additional class space for LCC along with an administration <br />room. The Full Program would expect to meet LEED Silver. <br />PBC asked about the sprinkler requirements and if the Low Price Option, which does not include <br />sprinklers, has been vetted with the Fire Department — Answer, it was not believed required by code <br />but has not been specifically vetted with the LFD or the School Committee. <br />Donna stated the use of the building is not changing and will continue as an education facility. What <br />has been presented meets code. <br />DPF commented this is a presentation of options for the Pelham Road Project and not a statement <br />of what the town should do. This distinction is very important. The options were developed <br />sufficiently to provide initial costing, but are not the result of an extensive study. <br />201 BEDFORD STREET • LEXINGTON, MASSACHUSETTS 02420 <br />