Lexington Home Page
|
Help
|
About
|
Browse
Search
2016-04-28-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2016
>
2016-04-28-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:14 PM
Creation date
6/3/2016 10:42:08 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PBC inquired about timing issues. DiNisco estimates drawings will be at 90% by the beginning <br />of June, reconciliation numbers should be by mid -June, and would need a couple of weeks to <br />get the package to Bond. <br />• PBC inquired about plumbing and electrical price reductions in the site enabling package. Bond <br />explained that under slab work was included in the locker room GMP and other plumbing & <br />electrical work will be included in the final GMP for the addition. <br />• Part of the site enabling work did include some numbers for items like doors and frames as <br />there is some of that work included in the site enabling phase to properly prepare for the <br />additions. <br />PBC Motion to approve $3,684,253 mini GMP for the locker room - APPROVED. <br />PBC Motion to approve $12,047,613 Site Enabling mini -GMP (Site /Concrete /Steel) — APPROVED. <br />3. Steel column removal at Diamond <br />General discussion on a prior request to obtain pricing to remove additional steel columns in the drama <br />room at Diamond to open up the room more for use by removing more existing columns and adding <br />additional steel beams. <br />• Bond stated that they did not have a final figure yet on the potential costs to remove these <br />columns referencing prior discussions about the difficulty currently in getting steel pricing. Their <br />one steel vendor to date did not indicate a price on the alternate which is where this work is. <br />Bond estimated it would be as much as 2 more weeks before we would have a hard number but <br />would push for it sooner and they would price it themselves if they could not get someone to <br />cost it. <br />• It was asked if the design team had discussed this with the school. The design team responded <br />Yes. <br />• DiNisco informed the committee the columns size did get reduced from a 12x12 to 5 "x5 ", and <br />went from an original 4 to 2 columns in the room. <br />• Another PBC member felt there should be no additional cost incurred for removing the columns <br />in what is considered a "practice room ". No performances will be held here. <br />• DiNisco drew a rough sketch showing the drama room's size and placement of the columns, <br />and discussed how the space is intended to be used. <br />• DPF commented that it is a program issue and SC should be consulted if this were to be <br />furthered, which would take more time to complete. <br />PBC took a vote to see if there was support to recommend the removal of the columns to the <br />School Committee; 7 - No & 1 — Yes, THE MOTION FAILED. <br />PBC Meeting 04.28.16 Page 3 <br />