Laserfiche WebLink
4. Clarke Stair Discussion <br />Discussion on a prior request to price the savings of moving the main entry stair on the site and <br />reducing the size or configuration of the canopy over the stair. PBC had prepared sketches showing the <br />work and Bond was to prepare an estimate. Bond / DiNisco advised that a real estimate was not <br />complete at this time and that they were still working on developing the costs. <br />• PBC asked if the canopy has been pulled back. DiNisco stated "Yes" and the credit estimate at <br />this time on the canopy was approximately $10,000 - $15,000. <br />• PBC was unhappy that a full price was not estimated yet and that several members felt the <br />overall entry way was not appealing, further that they felt costs in the neighborhood of $100,000 <br />were being spent on the current design and that savings could be realized and appropriated <br />more effectively inside the classrooms. <br />• There was continued discussion on design approach to the stair location. Covering the stairs or <br />not, safety, circulation etc. <br />• There was additional discussion about the appropriate time in the process to weigh in on issues <br />in the design, such as this. <br />• The PBC ended the discussion with general consensus that the stair design issue be brought to <br />the school committee and they should consider the stair & canopy changes and to realize what <br />ever costs savings might come from it. <br />7. Next Meeting Date is Thursday May 12, 2016 at 7:OOpm <br />Motion to adjourn was made and seconded: Meeting adjourned at 8:33pm. <br />PBC Meeting 04.28.16 Page 4 <br />