Laserfiche WebLink
i <br />DESCRIPTIONITEM <br />• <br />General Site Preparation Temp Controls, Erosion Controls, R&D, <br />$278,000 <br />Earthwork & Rough Grading, etc. <br />Pedestrian Walkways, ADA Accessibility & <br />v. Site Improvements Circulation Pathways, Parking Lot. Cricket <br />Pitch <br />$337,000 <br />Excavation, Drainage, Rootzone, Seeding, <br />Multi -Use Field Irrigation &Turf Establishment. Includes <br />surrounding field areas. <br />$1,444,000 <br />Lighting Field Lighting, Electrical service, Electrical <br />$1 170,000 <br />cabinet conduit & wiring <br />Earthwork Excavation, Ledge Removal, R&D Existing <br />$390,000 <br />Hardscapes, Cut & Fill. <br />ESTIMATED TOTAL* <br />$3,620,000 <br />�\ *Includes P b'3dization, Overhead & Profit (15%) Design (12%) & Contingency (25%) <br />K: <br />i <br />, <br />y <br />v <br />G <br />`� Town of • <br />-' yx Lexln lon Athletic Field Study- 2022 " <br />'' ���' Lexington, Massachusetts Weston Stimpson <br />Massachusetts g <br />