Laserfiche WebLink
i <br />•` sms" Town of • <br />;; 43 f exi wao n Athletic Field Study- 2022 <br />' Lexington, Massachusetts <br />Massachusetts g <br />Weston @Sampso h <br />ITEM <br />DESCRIPTION <br />COSTS <br />General Site Preparation <br />Temp Controls, Erosion Controls, R&D, <br />$278.000 <br />Earthwork & Rough Grading, etc. <br />Site Improvements <br />Pedestrian Walkways, ADA Accessibility & <br />$325,000 <br />Circulation Pathways, Parking Lot. <br />Multi -Use Field- <br />Synthetic Turf Field, Stormwater <br />$4,013,000 <br />Synthetic <br />Infrastructure <br />Lighting <br />Field Lightings, Electrical service, Electrical <br />$1,170,000 <br />cabinet conduit & wiring <br />Earthwork <br />Excavation, Ledge Removal, R&D Existing <br />$390,000 <br />Hardscapes, Cut & Fill. <br />ESTIMATEDTOTAL* <br />$6,180,000 <br />*Includes Mobilization, Overhead, & Profit (15%) Design (1201o) & Contingency (2511.) <br />^� <br />t <br />NM <br />Weston @Sampso h <br />