|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-08-17-REC-min-att
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Recreation Committee-REC
>
Minutes
>
2022
>
2022-08-17-REC-min-att
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 9:52:29 AM
Creation date
10/5/2022 12:32:53 PM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes - REC - Recreation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ar. <br />---------------- <br />ITEM <br />- <br />m <br />i <br />M a s s a c h u s e t t s Lexington, Massachusetts <br />*Includes Mobil�'zation, Overhead, & Profit (15%) Design (12%) & Contingency (25%) <br />Weston& Sampson' <br />DESCRIPTION• <br />General Site Preparation <br />Temp Controls, Erosion Controls, R&D, <br />$314,000 <br />Earthwork & Rough Grading, etc. <br />Site Improvements <br />Pedestrian Walkways, ADA Accessibility & <br />$133,000 <br />Circulation Pathways. <br />Multi -Use Field- <br />Synthetic Turf Fields, Stormwater <br />$2,280,000 <br />Synthetic <br />Infrastructure <br />Excavation, Drainage, Rootzone, Seeding, <br />Multi -Use Field- Natural <br />Irrigation & Turf Establishment. Includes <br />$1,744,000 <br />surrounding field areas. <br />Baseball/ Softball Field <br />Infields, Fencing, Dugouts, Backstops <br />$353,000 <br />Lighting <br />Turf Field & Tennis Court Lighting, Footings, <br />$2,029,000 <br />Electrical service, cabinet, conduit & wiring <br />Earthwork <br />Excavation, Ledge Removal, R&D Existing <br />$607,000 <br />Hardscapes, Typ. Cut & Fill <br />ESTIMATEDTOTAL* <br />$7,460,000 <br />*Includes Mobil�'zation, Overhead, & Profit (15%) Design (12%) & Contingency (25%) <br />Weston& Sampson' <br />
The URL can be used to link to this page
Your browser does not support the video tag.