Laserfiche WebLink
ar. <br />---------------- <br />ITEM <br />- <br />m <br />i <br />M a s s a c h u s e t t s Lexington, Massachusetts <br />*Includes Mobil�'zation, Overhead, & Profit (15%) Design (12%) & Contingency (25%) <br />Weston& Sampson' <br />DESCRIPTION• <br />General Site Preparation <br />Temp Controls, Erosion Controls, R&D, <br />$314,000 <br />Earthwork & Rough Grading, etc. <br />Site Improvements <br />Pedestrian Walkways, ADA Accessibility & <br />$133,000 <br />Circulation Pathways. <br />Multi -Use Field- <br />Synthetic Turf Fields, Stormwater <br />$2,280,000 <br />Synthetic <br />Infrastructure <br />Excavation, Drainage, Rootzone, Seeding, <br />Multi -Use Field- Natural <br />Irrigation & Turf Establishment. Includes <br />$1,744,000 <br />surrounding field areas. <br />Baseball/ Softball Field <br />Infields, Fencing, Dugouts, Backstops <br />$353,000 <br />Lighting <br />Turf Field & Tennis Court Lighting, Footings, <br />$2,029,000 <br />Electrical service, cabinet, conduit & wiring <br />Earthwork <br />Excavation, Ledge Removal, R&D Existing <br />$607,000 <br />Hardscapes, Typ. Cut & Fill <br />ESTIMATEDTOTAL* <br />$7,460,000 <br />*Includes Mobil�'zation, Overhead, & Profit (15%) Design (12%) & Contingency (25%) <br />Weston& Sampson' <br />