|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-08-17-REC-min-att
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Recreation Committee-REC
>
Minutes
>
2022
>
2022-08-17-REC-min-att
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 9:52:29 AM
Creation date
10/5/2022 12:32:53 PM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes - REC - Recreation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM DESCRIPTION COSTS <br />General Site Preparation Temp Controls, Erosion Controls, R&D, $249,000 <br />i ; AA A Earthwork & Rough Grading, etc. <br />Pedestrian Walkways, ADA Accessibility & <br />U \ \ ✓ Site Improvements Circulation Pathways, Parking Lot, Cricket $232,000 <br />Pitch <br />✓: ///��� ��., Excavation, Drainage, Rootzone, Seeding, <br />% \ \ Multi -Use Field Irrigation &Turf Establishment. Includes $1,786,000 <br />,�, ��� \ � � �' � � � �0 � � \ �• surrounding field areas. <br />\ Baseball/ Softball Field Infields, Fencing, Dugouts, Backstops $426,000 <br />r <br />\ Excavation, Ledge Removal, R&D Existing <br />Earthwork <br />Hardscapes, Typ. Cut &Fill. $450,000 <br />ESTIMATEDTOTAL* $3,140,000 <br />*Includes Mobilization, Overhead, &Profit (15%) Design (1201o) &Contingency (2551o) <br />r <br />4 <br />1 / <br />J�.\.j <br />\ <br />ice\ %/ <'� ���✓ \� . ��) � \� � �I � ,� � <br />v. <br />w <br />T . + <br />Lown of <br />exln lon Athletic Field Study- 2022 <br />Weston ®Sampson(DMgassachusetts Lexington, Massachusetts <br />
The URL can be used to link to this page
Your browser does not support the video tag.