Laserfiche WebLink
Lexington Police Facility V.E. Review <br /> Value Engineering Item/Scope Possible Cost Recmnd Comments <br /> Reccomended <br /> Defer <br /> Not Reccomended <br /> v <br /> 0 0° a N <br /> Potential Savings <br /> 1 Deduct Social Services office fit-out $105,000 <br /> Exposed framing on inside of offices,no floor or wall Architect This Space was added to the design to reflect input received from the community <br /> finishes,no ceilings. Heat,Ventilation,and electricity converstation. Defering this work will see increased costs at the time it is <br /> brought to area but not fitted to offices. performed. <br /> DPF Defering the balance of Construction will only increase costs. <br /> Police The Community expressed a desire for this space. <br /> PBC <br /> SB <br /> 2 Deduct De-EscalationTraining Fit-out $50,000 <br /> Exposed framing on inside of space,no floor or wall Architect This Space was added to the design to reflect input received from the community <br /> finishes,no ceilings. Heat,Ventilation,and electricity Iconverstation. Defering this work will see increased costs at the time it is <br /> brought to area but not fitted to room. performed. <br /> DPF <br /> Police The Community expressed a desire for this space. <br /> PBC <br /> SB <br /> 3 Deduct Glass&Millwork partitions $75,000 <br /> Replace with solid drywall partitions and HM doors Architect Was in response to Community input for visibility and provides transparency to <br /> Administrative staff. <br /> DPF <br /> Police The Community expressed a desire for this transparency <br /> PBC <br /> SB <br /> 4 Remove dormer at rear of building $43,000 <br /> Architect <br /> Provides natural Light in to Locker room areas and reduces need for artificial light. <br /> DPF <br /> Police The increased natural light will provide a healthier workspace for staff. <br /> PBC <br /> SB <br /> 5 Change Brown Stone to Cast Stone $116,150 <br /> Change Brownstone Base at Fa4ade ad at door Architect The Brownstone was chosen to provide a natural base to the Police building.The <br /> surrounds to Cast Stone Town office building is brick to grade,while the Cary Building has a granite base <br /> at the front,so it was thought that the brownstone was a good tone to align with <br /> the Town Office building materials. <br /> DPF May impact HDC approvals <br /> Police <br /> PBC <br /> SB <br /> 6 Fire Supression at IT and Evidence Rooms $160,000 <br /> Change the Clean Agent Supression in these areas to Architect The use of Clean Agent is the Best application for use in the Evidence and <br /> traditional water Network rooms. A completely wet system is not reccomended,and a pre-action <br /> system adds a human component that interupts the fail safe system. <br /> DPF Clean agent Fire Supression application in these rooms seems appropriate. <br /> Police PD is concerned about the preservation of both equipment and Evidence against <br /> leaks,accidental activation,etc. <br /> PBC <br /> SB <br />