Laserfiche WebLink
7 High Density Storage $225,000 Eliminates High Density systems entirely with no replacements <br /> $175,000 Changes High Density systems to standard files and metal shelving <br /> $75,000 Moves Hig Density Systems to FF&E(potential Savings) <br /> Architect The High Density system was included in the Bid Process in an attempt to <br /> streamline installation.This equipment is routinely provided under the <br /> Furniture/equipment process at which time the scope can be adjusted to the <br /> current budget.Some savings likely. <br /> DPF DPF supports moving to FF&E.We have successfully taken this approach on other <br /> projects <br /> Police PD supports providing designing the structure to carry the required loads, but <br /> moving the Item to the equipment budget.The use of High Density systems in <br /> both areas will drastically improve theDepts ability to properly maintain both <br /> evidence and Records. <br /> PBC <br /> SB <br /> 8 Parking Garage/Vehicle Maintenance notdetermined <br /> remove exterior walls and leave as open air parking Architect This deletion would eliminate the maintenance bays and leave program needs <br /> with upper floor of building extending over"outdoor" unaddressed. If these walls are eliminated it would alter the make up of <br /> parking remaining walls to accommodate changes in thermal needs. <br /> DPF Removal of the garage walls would change the overall image/design of the <br /> building and impact HDC approval Process,considerable re-design would likely be <br /> required. <br /> Police Removal of the garage area is not reccomened by the user. <br /> PBC <br /> SB <br /> 9 Emerg.Generator to Critical loads only $200,000 <br /> Architect 80%of the building would not be supported during power loss.The Police <br /> station is a critical operations facility and needs power in all areas to respond to <br /> Community needs in an emergency.The new Fire station is also an Essential <br /> Facility and has 100%emergency power. <br /> DPF DPF defers to the Police Departments Operational Needs <br /> Police The Dept,needs to be fully operational,especially if there are crisis situations, <br /> such as power loss. <br /> PBC <br /> SB <br /> 10 Reduce Landscaping by 15% $36,000 <br /> Architect This represents a flat reduction of undefined scope to support a value engineering <br /> process. <br /> DPF <br /> Police <br /> PBC <br /> SB <br /> 11 Interior lighting changes&reductions $100,000 <br /> Architect Based upon Fixture cost estimates,Light level analysis and energy modeling, <br /> adjustments can be made to fixture type and qty without impact to the user <br /> DPF <br /> Police <br /> PBC <br /> SB <br /> 12 Reduce AV Scope $100,000 <br /> Architect ]Reductions can be made,based upon evaluation of Cost Estimate assumptions <br /> and a final AV coordination mtg.,without effec ting Building user performance. <br /> DPF <br /> Police <br /> PBC <br /> SB <br />