#18 Change Terrazzo floor to porcelain tile— PBC added a Recommendation to consider Terrazzo tile as the <br /> project will retain the durability of the material but should realize a cost savings over the poured Terrazzo floor. <br /> An update on the status of the proposed High School project was requested. <br /> DPF Director, gave the following update. <br /> Ajoint mtg between School Committee (SC) and Select Board (SB) was held on or about March 9, 2022 to <br /> discuss the potential High School Project. <br /> There is a Special Town Meeting scheduled to be held on 4/11/22 to request approximately $1.825 million <br /> dollars for a Lexington High School Feasibility study. <br /> The Town had been notified that Lexington was invited into the Eligibility Period by the MSBA for the High <br /> School, however, the invitation will not be official, and no work can begin, until June 1, 2022. From that date <br /> on the Town will have 270 calendar days to complete the required tasks in the Eligibility period. <br /> At the joint SC /SB mtg the composition of the future School Building Committee (SBC) was discussed. The <br /> MSBA suggested qualifications of the future SBC members and it was suggested that they would not <br /> necessarily use the entire PBC committee as the base membership of the SBC, as had been done in the Past. <br /> This discussion was reported as a work in progress. <br /> It was noted that the Town's Integrated Design Policy had requirements that should be considered when the <br /> discussion resumes on how the future SBC is formed. <br /> Meeting Adjourned 8 PM. <br />