Laserfiche WebLink
13S 75 TOWN OF LEXINGTON 2022 01Juin, 12A3 pin't <br /> Permanent Building Committee TOWN CLERK <br /> 5 Permanent Members <br /> LEXINGTON MA <br /> < "PRIL1V Jon Himmel Co-Chairman Charles Favazzo Co-Chairman <br /> EX1N61 > > > > <br /> Peter Johnson,Philip Coleman, Cells Brisbin, Elizabeth Giersbach, Frederick Merrill <br /> Police Station Members: Semoon Oh, Wendy Krum <br /> Associate Members: Curt Barrentine,Henrietta Mei <br /> PBC Minutes for the meeting held on: 03-24-2022 <br /> Meeting was held remotely via Zoom <br /> Members Present: <br /> Jon Himmel, Charles Favazzo, Celis Brisbin, Elizabeth Giersbach, Wendy Krum, Henrietta Mei <br /> The Meeting was called to order at 5:00pm. <br /> There was brief discussion about the meeting minutes that had been sent out for review for 03 February and <br /> 24 February 2022. All parties had not had the opportunity to complete their review so these minutes will be <br /> taken up at the next meeting. <br /> The primary agenda item was to review the Value Engineering list for the Police Station project. It was decided <br /> to discuss each item as the review went thru the last and forego an initial overview, since the items were <br /> briefly discussed at the last meeting. <br /> There are 21 items on the V.E. List and each item was discussed in some detail. The final recommendation of <br /> the PBC was identified on the VE list, attached, with a: <br /> Red Square— "PBC does not recommend adoption of this item" <br /> Yellow square —"PBC Not offering an opinion" <br /> Green Square —"PBC Recommends pursuing this potential savings" <br /> The VE List also shows that the Department of Public Facilities and the Police Department had previously <br /> reviewed the list and took similar action on each item, for their recommendations. <br /> For each item on the VE list, the PBC added a comment, where they felt appropriate, regarding their <br /> recommendation. <br /> At the bottom of the VE list is a summation of the possible project cost value that could be realized by <br /> following the recommendations made on the list. <br /> All PBC recommendations and comments are noted on the attached VE List, however there were 5 VE items <br /> that the PBC made an additional recommendation for, as noted below. <br /> #4 Rear Dormer— PBC Recommended that the Rear Dormer could be looked at as an additive Bid Alternate. <br /> #7 High Density Storage — PBC recommends moving the High-Density storage to the FF&E phase but to keep <br /> the appropriate slab depressions in the building to allow for flush install. <br /> #9 Reduce Generator to Critical loads only - PBC did not support reducing the load coverage but did suggest <br /> that an evaluation be done to determine if having two, smaller generators provided an advantage. <br /> #16 Move Window blinds to FF&E— PBC supported elimination of any electrically powered blinds and have <br /> manual blinds only under the FF&E phase. <br />