Laserfiche WebLink
11 \� <br /> • <br /> The price figured then for- this wprk was $139,000.00; and there <br /> is a possible 20% increase, which would mean that this fugure <br /> should be increased by $17,800.00 800.00 making a total of $166,800.00. <br /> 6t This budget will have to be changed to this amount. Also an <br /> Ititem of $6,000.00 is to be included to take care of the sewer <br /> extensions in the Town. On these new serer mains, the abutters <br /> pay one-half the cost. <br /> Colonel Barry stated that already- he has had a <br /> meeting of the members in the Manor section, and a committee <br /> has been formed of the Manor people. After January 1, 1946, <br /> petitions are 7oing to be taken out and the Committee is to <br /> get the signatures of the abutters. <br /> T rai_n Construction. Colonel Barry said - that the <br /> informaton sheet said drainage should be changed. He has <br /> figured the budget for doing same, but as he said, "Let ypur <br /> conscience be your guide, Gentlemen." <br /> • Garbage Collection. Colonel Barry has nothing to <br /> say on this budget as it is under contract. <br /> Care of Dumps and Removal of Ashes. - This budget <br /> includes the salary of the man at the Dump now, and the cost <br /> jjojajjiTMIIijjll <br />