|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-12-04-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2010
>
2010-12-04-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:36 PM
Creation date
4/17/2015 1:35:06 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />14 December 2010 Meeting <br />2.61PunchList <br />Forthepurposesofreducingongoingprintedtext,previousentriesunderthisheadingmayhavebeenremovedfromcurrent <br />meetingminutes.Pleaserefertopreviouseditionsoftheminutesforolderinsertions. <br />03/09/10 <br />PBCwouldlikescheduleforalloutstandingitemsatnextmeeting. <br />06/08/10 <br />HKTpresentedpunchlistmanyitemsarewarrantyissues. <br />9/14/10 <br />HKTpresentedupdatedpunchlistandwarrantyitems. <br />PBCaskedifvehiclewashbayitemswerepartofthepunchlist.HKTrespondedthattheywerenot,astheydidnotariseuntilwell <br />afterthepunchlistwascreated. <br />12/14/10 <br />HKTreportedpunchlistcomplete. <br />2.73FluidDistributionSystem <br />Forthepurposesofreducingongoingprintedtext,previousentriesunderthisheadingmayhavebeenremovedfromcurrent <br />meetingminutes.Pleaserefertopreviouseditionsoftheminutesforolderinsertions. <br />01/12/10 <br />Ongoing <br />03/09/10 <br />ContractorReps.willcontactMarkBarretttostartworkonsystem,DPFreviewedwiththemechanicswhoagreedthatnonew <br />waterlinetothissystemwasneeded. <br />7/13/10 <br />Partsareonorderforinterfacingsystemwithexistingtankmonitoringsystemandspillboxes,whenreceivedsystemwillbe <br />complete. <br />12/14/10 <br />WasteOilHeater&FluidDistributionSystemat98%complete <br />2.82WashBay <br />04/13/10 <br />ThePBCtouredthevehiclecarwashareatoreviewthecurrentconditionsoferosion,paintdecay,waterseepageandequipment <br />operation.SeeHKTemailof12810andHKTlettersof2410and32510andRWSullivanmemoof51210. <br />AftermuchdiscussionofthemanyissuesinvolvedthePBCrequestedthatHKTreturntothenextmeetingwithrecommendationson <br />howeachitemcanbeaddressedandresolved. <br />5/11/10 <br />HKTpowerpointpresentationwillbeforwardedtoDPF. <br />DesignteamhasnotseenthistypeofconditionwithsimilarsystemsinotherDPƭ͵ <br />Reviewofsteel,operatoranddisconnect. <br />Discussionneededofsequenceofoperationforthecarwash. <br />PBCdiscussedHKTpursuingpaintertogetthemtodoasmuchaspossible,butdoitright. <br />Motiontosetasidemoniestohireaspecialisttoreviewconditionsandprocessesofthewashbayarea,mayincludeforensics. <br />Motion:DickPerry2nd:EricBrownVote:50 <br />6/08/10 <br />SimpsonGumpertz&HegerProposalwasreviewedbyPBC.PBCmemberswouldlikethescopeandtasksforinvestigationneedsto <br />bedefined.MarkBarretttocoordinateameetingtodiscusswithGregfromSG&H. <br />7/13/10 <br />Meetingwasheldon6/18/10toreviewSGHScopeonreportforvehiclewashBay. <br />Draftreportdueon7/26/10forPBCreviewandproposedreviewmtgon7/28/10withTownManager. <br />9/14/10 <br />WhenestimateisreceivedDPFwillsendouttoPBCmemberstoreview. <br />10/12/10 <br />cussedthatinfuturecontractsSystemDesignStatementsalongwithtrainingrequirementsneedtoincludedesign <br />Itwasdis <br />intent. <br />Page 5 of 12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.