|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-06-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2010
>
2010-06-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:35 PM
Creation date
4/17/2015 1:20:01 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />08 June 2010 Meeting <br />2.82 Wash Bay <br />04/13/10 <br />The PBC toured the vehicle car wash area to review the current conditions of erosion, paint decay, water seepage and equipment <br />operation. See HKT email of 1 -28 -10 and HKT letters of 2 -4 -10 and 3 -25 -10 and RW Sullivan memo of 5- 12 -10. <br />After much discussion of the many issues involved the PBC requested that HKT return to the next meeting with recommendations on <br />how each item can be addressed and resolved. <br />5/11/10 <br />HKT power point presentation will be forwarded to DPF. <br />Design team has not seen this type of condition with similar systems in other DPW's. <br />Review of steel, operator and disconnect. <br />Discussion needed of sequence of operation for the car wash. <br />PBC discussed HKT pursuing painter to get them to do as much as possible, but do it right. <br />Motion to set aside monies to hire a specialist to review conditions and processes of the wash bay area, may include forensics. <br />Motion: Dick Perry 2nd: Eric Brown Vote: 5 -0 <br />6/08/10 <br />Simpson Gumpertz & Heger Proposal was reviewed by PBC. PBC members would like the scope and tasks for investigation needs <br />to be defined. Mark Barrett to coordinate a meeting to discuss with Greg from SG &H. <br />2.83 Front Walkway <br />6/08/10 <br />Suggestion to have a walkway connecting the public sidewalk to the building entrance. PBC suggest this should be a Town <br />Engineering design. Bill Hadley to follow up on design and cost estimate. <br />5.0 Fire and Police Study and Design <br />5.2 Confirmation of Fire Department Space needs <br />04/13/10 <br />Confirmation of Fire Department Space needs was discussed and the architects report 95% finalized, will report next meeting. <br />5/11/10 <br />Donham & Sweeney reviewed Maguire Study with the Chief. Square Foot needs +/- 1,000 sf, chief is in agreement. <br />5.3 Police Department Space Needs <br />04/13/10 <br />Development of Police Department space needs was completed and transmitted to PBC. <br />Chief to review with Staff and Architects to meet with Police staff to review <br />There was discussion as to whom should challenge the space needs of this or any program developed. <br />5/11/10 <br />Police program was reviewed with staff. The firing range and locker sizes are issues still in discussion. The Architects are to continue <br />to meet with the Police Department representatives. <br />6/08/10 <br />Space programming is ongoing. Discussion of locker size and firing range still ongoing. <br />5.4 Zoning assessment Report <br />04/13/10 <br />Zoning assessment Report was delivered to the PBC and reviewed <br />PBC recommended Architects meet with Town Zoning official to review. <br />5/11/10 <br />Regulatory reviews, Donham & Sweeney met with zoning officer reviewed made corrections and resubmitted. <br />Existing vs. proposed areas of relief needed. <br />Final document to go to Town counsel. <br />Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.