Laserfiche WebLink
PBC Meeting Minutes <br />13 October 2009 Meeting <br />10/13/09 <br />Processed to TOB as a Purchase order as items on State Vendor Contract for cost of $54,542.02, included a safety belt <br />$215.93 not previously approved. <br />2.31 Bi-Directional Radio <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from <br /> <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />8/11/09 <br />HKT has received Fire Department feedback and is sending the RFP out to prospective bidders / installers. <br />9/8/09 <br />Proposals have been received, to be evaluated by HKT Architects. <br />PBC would like verification that battery backup is provided for the antenna system. <br />Copies to be sent to the fire department for review as well. <br />Motion to award contract to the lowest qualified eligible bidder, not to exceed $54,416.00 <br /> <br />Motion: Bill Kennedy Second: Peter Johnson Vote: Unanimous <br />2.34 Movers <br /> <br />5/19/09 <br />The PBC approved the award of a Purchase Order to Sterling movers for the relocation services of the DPW and DPF <br />Offices. <br />Motion to approve quote of $8,684.00 to Sterling Movers. <br />Motion Eric Brown Second: Dick Perry Vote Unanimous <br />8/11/09 <br />The remaining move element is for the moving of the Vault contents, which will be completed after the high density files <br />are completed. Vendor is being paid for completed portions of the move. <br />10/13/09 <br /> <br />Vault contents to be moved 10.14.09. <br />2.40 Pavement testing <br />6/24/09 <br />Pavement Testing $3,50.00 <br />Motion to approve $350.00 for Pavement testing. <br />Motion: Dick Perry Second: Jon Himmel Vote Unanimous <br />9/8/09 <br />$6,600.00 F.S.T invoice to be paid by contractor. <br />2.55 PCO 130 Exterior Corrugated Metal Panel <br />7/14/09 <br />HKT still investigating <br />Issue involves proper sealing of the building skin, specifically at seams and penetrations prior to the installation of the <br />metal panels. PBC recommends review of clerk of the works photos and videos during construction to gain confidence in <br />thoroughness of work and the removal of selected panel locations as a sampling to expose area and inspect for proper <br />sealing. <br />9/8/09 <br />HKT to investigate materials used and to quantify number of locations where product was used after penetrations <br />through finished wall system. Also PBC recommends a review of the condition 9 months in to the 1 year warranty period <br />to identify problems in advance if they exist. <br />10/13/09 <br />Concern - warranty on waterproofing system intact after spray foam was used. Is it compatible with waterproofing <br />system. HKT to follow up with CTA, sub and manufacturers rep. <br />Page 4 of 8 <br /> <br />