Laserfiche WebLink
PBC Meeting Minutes <br />11 August 2009 Meeting <br />2.51 PCO 136 - Additional seeding at slope <br />7/14/09 <br />Rear slope of site, which increased in size to reduce amount of material being removed from site at high cost requires <br />seeding. <br />To approve PCO 136 in the amount of $13,476.91 for the installation of the added seeding at rear slope <br />Motion: <br />Motion: Dick Perry Second: Peter Johnson Vote: Unanimous <br />2.52 PCO 134 – Added Security Camera <br />7/14/09 <br />PBC discussed value of adding additional camera and requested DPF to investigate adding camera if found to be <br />needed under maintenance. <br />2.53 PCO 133 – Rain Harvesting System Automation <br />7/14/09 <br />To approve PCO 133 in the amount of $4,226.70 for the automation of a portion of the rain harvesting system to <br />Motion: <br />integrate more effectively with the vehicle wash. <br />Motion: Peter Johnson Second: Dick Perry Vote: Unanimous <br />2.54 PCO 131 – Sealing Wash Bay <br />7/14/09 <br />PCO was not approved, HKT to investigate responsibilities of subcontractor.. <br />2.55 PCO 130 – Exterior Corrugated Metal Panel <br />7/14/09 <br />HKT still investigating <br />Issue involves proper sealing of the building skin, specifically at seams and penetrations prior to the <br />installation of the metal panels. PBC recommends review of clerk of the works photos and videos during <br />construction to gain confidence in thoroughness of work and the removal of selected panel locations as a <br />sampling to expose area and inspect for proper sealing. <br />2.56 PCO 123 & 129 – Concrete Apron Revised PCO 152 <br />7/14/09 <br />PBC in favor of reducing square footage to maintain methodology, but to keep costs as approved of $46,041.25 <br />8/11/09 <br />PBC discussed PCO 152 which reflects an improved standards for the concrete apron that will provide more <br />longevity to the finished product. Final cost of PCO 152 is $49,066.80, PCO’s 123 and 129 shall be voided. <br />To approve PCO 152 in the not to exceed amount of $49,066.80 with work to be performed on a time and <br />Motion: <br />materials basis, PCO’s 123 and 129 to be voided. <br /> Motion: Dick Perry Second: Peter Johnson Vote: Unanimous <br />2.57 PCO 118 Vehicle Exhaust Wiring <br />7/14/09 <br />Motion: To approve PCO 118 in the amount of $596.78. <br />Motion: Peter Johnson Second: Eric Brown Vote: Unanimous <br />Page 9 of 13 <br /> <br />