|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-07-14-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2000-2009
>
2009
>
2009-07-14-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:08:01 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />14 July 2009 Meeting <br />2.46 PCO 141 Installation of Town owned Lift <br />7/14/09 <br />The PCO was submitted at $13,026.00. The scope was discussed and the PBC asked the DPW to <br />look into alternative ways to install lift at more conservative costs. If alternative ways are not found <br />then the PCO is authorized for approval not to exceed $13,026. <br />Motion: DPW to meet with HKT to investigate options for a more conservative way to install <br />the existing lift, finding none, the proposed PCO 141 in the amount not to exceed <br />$13,026.00, shall be approved. <br />Motion: Peter Johnson Second: Eric Brown Vote: Unanimous <br />2.47 PCO 140 Stone Swale <br />7/14/09 <br />Motion: To approve PCO 140 in the amount of $3,248.25 (T&M) for the installation of <br />the proposed stone swale. <br />Motion: Eric Brown Second: Peter Johnson Vote: Unanimous <br />2.48 PCO 139 – Relocate Stanchion <br />7/14/09 <br />PCO was submitted to move the entry stanchion back 15 ft away from the gate for better vehicle access into <br />the facility. PBC requested that <br />DPW meet with HKT to investigate options for alternative methods to complete the <br />work and look at perhaps performing some of the work. <br />2.49 PCO 138 – Wetland Planting <br />7/14/09 <br />Motion: To approve PCO 138 in the amount of $3,646.35 for the installation of the <br />additional wetland planting. <br />Motion: Eric Brown Second: Dick Perry Vote: Unanimous <br />2.50 PCO 137 – Sidewalk railing <br />7/14/09 <br />Motion: To approve PCO 137 in the amount of $9,412.90 for the installation of the <br />sidewalk railings required for accessibility. <br />Motion: Peter Johnson Second: Dick Perry Vote: Unanimous <br />2.51 PCO 136 - Additional seeding at slope <br />7/14/09 <br />Rear slope of site, which increased in size to reduce amount of material being removed from site at high cost <br />requires seeding. <br />Motion: To approve PCO 136 in the amount of $13,476.91 for the installation of the <br />added seeding at rear slope <br />Motion: Dick Perry Second: Peter Johnson Vote: Unanimous <br />Page 11 of 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.