|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-02-10-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2003 - 2009
>
2009
>
2009-02-10-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:03:23 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 February 2009 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC <br />Location: Estabrook Hall <br />Date & Time: 10 February 2009, 7:00PM <br />01/13/09 <br />Commissioning to commence with start up. <br />2.4. DPW Construction Schedule Ongoing <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have <br />been removed from current meeting minutes. Please refer to previous editions of the minutes for <br />older insertions. <br />12/09/08 <br />Binder down. Schedule continues to show Certificate of Occupancy 4/29/09. HKT to investigate <br />what options are called for on warranty of HVAC Equipment. <br />Naming of building, Pat Goddard will check with Carl Valente to see what the process is. <br />01/13/09 <br />Schedule continues to show Certificate of Occupancy 4/29/09. <br />PBC requested copy of schedule with float showing. <br />02/10/09 <br />Schedule continues to show Certificate of Occupancy 4/29/09. <br />Schedule reflected 13 days of negative float. Permanent power is installed, millwork is being <br />installed and temp. heat is in place. <br />2.6 Soil Testing Required at Current Excavation <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have <br />been removed from current meeting minutes. Please refer to previous editions of the minutes for <br />older insertions. <br />10/14/08 <br />Excavation for underground storage tanks and Fuel Island was started and then stopped due to <br />excessive ground water in location. Testing on ground water showed that water could not be discharged <br />to storm water without filtering. Alternate plans developed to remediate ground water issue on site and <br />reflected in need for W&S score items 17 & 18. <br />Approval to have W&S to perform Task 17 and 18. <br />Motion: Bill Kennedy 2 Eric Brown Vote: Unanimous <br />nd <br />11/04/08 <br />Monitoring wells installed per DEP Requirements. <br />One additional Oil Drum has been found in continued excavations. The drum was captured and <br />handled properly however additional services are required from Weston and Sampson to <br />process this event as well as provide oversight in the underground fuel tank installation. <br />W&S approved to perform services for Task 19 and 20 in the amount of $5197.23. <br />Motion: Bill Kennedy 2nd: Carl Oldenburg Voted: Unanimous <br />01/13/09 <br />W&S closeout services approved in the amount of $29,194.00. <br /> <br />Motion: Peter Johnson 2nd: Dick Perry Voted: Unanimous <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.