04 November 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Central Office Conference Room <br />04 November 2008 <br />Date & Time: , 7:00PM <br />Ongoing Items <br />2.3 Commissioning Status CTA <br />For the purposes of reducing ongoing printed text previous entries under this heading may have <br />been removed from current meeting minutes. Please refer to previous editions of the minutes for <br />older insertions. <br />10/14/08 <br />Commissioning work shown on schedule, no new activity or meetings until equipment start up. <br />11/04/08 <br />Sebesta to start Energy Modeling, progress meetings should begin. <br />2.4. DPW Construction Schedule Ongoing <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have <br />been removed from current meeting minutes. Please refer to previous editions of the minutes for <br />older insertions. <br />8/12/08 <br />Work for the building remains to appear, largely, on schedule, relative to a spring 09 completion. There was <br />some discussion regarding the timing of the Certificate of Occupancy, as the delayed site work issues are <br />artificially pushing out the Certificate of Occupancy (CO) date. PBC requested inserting a temp CO date to pull <br />back building completion for use and allowing extended site work to stand on its own. <br />HKT outlined discussions with CTA regarding their intent to update schedule to reflect the large majority of site <br />work to be completed this fall as originally scheduled with only the rear portion of the site or as needed to <br />carry over to a delayed spring due to the environmental issues currently being resolved. <br />9/9/08 <br />Updated schedule distributed. Building on schedule. Certificate of Occupancy 4/29/09. Schedule broken out <br />to show rear of site work continuing into summer of 09. <br />Questions about temporary heat or system start up for temporary heat, needs to be discussed. <br />10/14/08 <br />Updated schedule was distributed. Schedule continues to show Certificate of Occupancy4/29/09, with <br />site work continuing through summer of 2009. <br />11/04/08 <br />Updated schedule was distributed. Building to be completed 4/29/09. Partial site to August 09. <br />2.6 Soil Testing Required at Current Excavation <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have <br />been removed from current meeting minutes. Please refer to previous editions of the minutes for <br />older insertions. <br />10/14/08 <br />Excavation for underground storage tanks and fuel island was started and then stopped due to excessive <br />ground water in location. Testing on ground water showed that water could not be discharged to storm <br />water without filtering. Alternate plans developed to remediate ground water issue on site and reflected in <br />need for W&S score items 17 & 18. <br />Approval to have W&S to perform Task 17 and 18. <br />Motion: Bill Kennedy 2 Eric Brown Vote: Unanimous <br />nd <br /> <br />3 <br /> <br />