Laserfiche WebLink
11 July 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />08 July 2008 <br />Date & Time: , 7:00PM <br />Ongoing Items <br /> <br />2.3 Commissioning Status HKT / SB <br />5/13/08 <br />David Fennell from Sebesta Blomberg (SB) gave a brief presentation on the status of the <br />Commissioning and what will be upcoming. <br />a. SB has been receiving and reviewing shop drawings right now, ATC is a critical shop drawing <br />b. SB stated that once the equipment is coming to the site they will meet with the Contractor <br />c. SB and GC to lead the coordination meeting with the subs <br />d. Training plans and O+MÔs are critical and SB will be reviewing and requiring them for review <br />soon. <br />e. Pat Goddard will want to review the materials as well, specifically for training materials <br />f. SB will look in spec to see what is required for training and cater it to the TownÔs needs <br />g. This commissioning process allows the project to get the LEED point for enhanced <br />commissioning. <br />h. PBC would like Pat to look into who he wants to be part of the training <br />i. Possibly look into video taping the training sessions <br />j. Handouts and or presentation materials / PowerPoint should be collected, in electronic <br />format if possible. <br />k. O+M to be in searchable PDF formats if possible <br /> <br />7/8/08 <br />The PBC was advised that a commissioning kick off meeting was scheduled for Thursday 7/10/08, <br />at 11:00 AM. The Meeting was to involve the TownÔs Commissioning Agent, CTA, HKT, and <br />applicable sub-contractors. <br />The PBC still has concerns over ensuring that the GCÔs schedule reflects adequate time for the <br />completion and proper scheduling of the commissioning work. PBC Chair, requested that the <br />Commissioning agent be given a copy (electronic) of the GCÔs schedule for implementation and <br />review <br /> <br /> <br />2.4. DPW Construction Schedule Ongoing <br />5/13/08 <br />The PBC reviewed the construction schedule from CTA <br />a. Slack should appear on the schedule Ï HKT to coordinate. <br />b. Critical Path items to be shown in red Ï HKT to ask CTA to provide a PDF in color for review <br />c. Discussion on what should happen if CTA is to submit a delay claim. HKT stated that a letter <br />was issued by CTA about the unforeseen conditions found at the site and the winter weather. HKT <br />stated that their preference is to address this issue as we get closer to substantial completion as the <br />schedule is still on track and there is a good relationship with CTA which would like to continue <br />d. The PBC was concerned about the lack of time for commissioning and ask HKT to address <br />with CTA and SB. <br />6/10/08 <br />Color copies of the construction schedule were distributed. Work appears to be on schedule with <br />the building largely complete by first Qtr. 09. <br /> <br />3 <br /> <br />