|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-12-12-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2013
>
2013-12-12-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:58 PM
Creation date
8/26/2014 10:31:04 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LexingtonPermanentBuildingCommittee <br />4.0 Bridge & Bowman Renovation Projects <br />4.62UpdatefromDPCandDaedalus <br />11/21/13 <br />M.Barrettprovidedoverviewofjobstatus.Commissioningstillunderway,Monetizedpunchlistuptodateandissued. <br />DiscussionstakingplacewithTLTonDirectPaymentresolutions,andprojectcloseout. <br />12/12/13 <br />Projectstatuswasoutlined,punchlistwasupdatedbytheArchitecttotaling624,315.62whichincludesthe$301,510.62claimas <br />wellas$77,500inLiquidateddamages.MuchoftheArchitecturalitemsonthepunchlisthasbeencomplete,althoughMEPitems <br />remainbutarebeginningtobeaddressed. <br />DPFalsoadvisedthatwehadreceivednoticefrom\[ƭSuretytoceaseanypaymentstoTLTandworkthroughthemonanydirect <br />paymentdemandsorfuturepayments.TheSurteyhadmadeapaymenttoInterstateelectricofabout$600,000.00 <br />4.64ChangeOrder <br />11/21/13 <br />MotiontoapproveChangeOrder#20intheamountofacredittothecontractfor$12,396.00,whichincludesCOR#182, <br />191,199,227,233,234,237asapprovedandrecommendedbytheArchitectofRecord,DesignPartnershipofCambridge. <br />nd <br />Motion:Eric2:CarlVote:700 <br />4.68AdditionalLibrarywork <br />10/10/13 <br />MotiontoincreasepriorapprovaltoShadrackConstructionforsheetrockandpaintoverLibrarypanelingatbothschoolsfrom <br />previouslyapproved$4,750.00revisedto$9,500.00. <br />Motion:Phil2 nd:ChuckVote:600 <br />4.71DirectPaymentRequests <br />11/21/13 <br />MotiontoapprovepaymentsinresponsetoDemandsforDirectPaymentfromFiledSubBiddersonBridge&BowmanProject <br />againstthecontractofTLTConstruction,totaling$2,402,401.75.WhichhavebeenreviewedbyDPFstaffwithTLTConstructionand <br />havebeenreviewedbyTownCounsel. <br />nd <br />Motion:Dick2:EricVote:800 <br />12/12/13 <br />MBarrettoutlinedtheamountsofdirectpaymentstobemadetoeachFiledSubBidderthathadfiled.Theseamountswere <br />reviewedwithTLTandTownCounsel.Asummarysheetofthepaymentswasdistributed. <br />MotiontoapproveDirectpaymentsnottoexceed$1,929,377.06andescrowdeposits$170,219.89toFiledSubBiddersofthe <br />TLTContract,asreviewedbyTownCounselandsummarizedintheDocumentonfileͻ{ǒƒƒğƩǤofDirectPaymentsbeingmade <br />1212ЊЌͲͼafterresolutionofsuretyrequesttoholdpayments. <br />Motion:Phil2 nd:EricVote:500 <br />4.73InsulationProject <br />11/21/13 <br />MotiontoapprovetheawardofBridgeBowmanSprayinsulationproject(towncontract1429)toallowforimmediateawardand <br />startofwork,nottoexceedthebudgetedamountof$85,000.00. <br />Motion:Eric2 nd:JonVote:800 <br />12/12/13 <br />MBarrettupdatedthattheinsulationprojectbidswereinandthattheprojectwasbeingawardedtoShadrackConstructionfor <br />$58,600andthatworkwasbeginningthiscomingweekendwiththehopeofmostworkbeingcompletedoverChristmasvacation. <br />Page 2 of 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.