|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-10-10-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2013
>
2013-10-10-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:58 PM
Creation date
8/25/2014 3:06:21 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee <br />4.72 Added Electrical work not in scope <br />10/10/13 <br />Motion to approve estimate from Quinn Electrical Services in the amount of $4,900.00 to supply data and power to the shade <br />structure at Bowman. <br />Motion: Phil 2: Jon Vote: 6-0-0 <br />nd <br />4.73 Insulation Project <br />10/10/13 <br />Motion to approve the estimated cost from Spry for storage and delivery of flooring tiles for Bridge School in the amount of <br />$3,768.00. <br />Motion: Phil 2: Jon Vote: 6-0-0 <br />nd <br />4.74 Budget Transfers <br />Motion to approve the following transfers to the Project Budget. <br />$65,000 from 58206 to 58204 <br />$450,000 from 58220 to 58202 <br />$100,000 from 58220 to 58209 <br />$50,000 from 58220 to 58219 <br />Motion: Phil 2: Jon Vote: 6-0-0 <br />nd <br />4.75 Added services Daedalus <br />Motion to approve contract extension to Daedalus Projects in the amount of $ 26,820.00 for continued project support. <br />Motion: Carl 2: Dick Vote: 6-0-0 <br />nd <br />7.0 Estabrook Elementary <br />7.66 Change Order Detail <br />11/8/12 <br />PBC raised a question regarding the percentage mark ups to change orders (10% / 5%) and what happens on negative change <br />orders? CP to discuss at next meeting. <br />7.70 Flooring <br />11/8/12 <br />Discussion on variances in the overall system depth of the various manufacturers for the Stage and gym flooring products as <br />specified. Final discussion was to base the sub floor elevation on the deepest system requirement and incorporate transition strips <br />if / where needed to accommodate final variance based on final flooring choice. <br />7.71 Telephone and data System <br />10/10/13 <br />Motion to authorize expenditure of up to $160,000 of the Estabrook Project Technology Budget for the purpose of procuring the <br />appropriate Network Switches that need to be installed to support telephone and data system installations for occupancy. <br />Motion: Phil 2: Dick Vote: 6-0-0 <br />nd <br />Motion to approve the expense of $8,228.45 to RCN for Fiber Service installation at Estabrook School. <br />Motion: Phil 2: Jon Vote: 6-0-0 <br />nd <br /> Page 4 of 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.